This section contains documents, testing results, reports, work plans and other information related to the Bannister Environmental Program as it pertains to Building 2 at 1500 East Bannister Road. The information is updated periodically. If you have questions regarding the information in this section, please send them to the R6 Environmental mailbox at R6environment@gsa.gov. To jump to the documents for a specific year, please use the tabs below:

Documents for years 2012 - 2007

Jump to an individual year: 2012 2011 2010 2009 2008 2007

Click the Date to view and read/download an individual document
Date Description Results
2012
05/24/2012 The U.S. Environmental Protection Agency has reviewed  Area Air and Sub-Slab Air  Quarterly Monitoring Report-Buildings 1 and 2 These are the conclusions from Area Air  and Sub-Slab Air Quarterly Monitoring Report Buildings 1 and 2.
04/12/2012 Area Air and Sub-Slab Air Quarterly Monitoring Report. Based on the results of sub-slab, indoor, and ambient air sampling event, Terracon recommends continued quarterly air sampling for VOCs, per the site specific Work Plan/QAPP
04/03/2012 Area Air and Sub-Slab Air Quarterly Monitoring Report Buildings 1 and 2. Based on the results of the sub-slab, indoor, and ambient air sampling event, Terracon recommends continued air sampling for VOCs on an semi-annual to annual basis. The calculated cancer risks levels for the identified PCBs are within the range considered acceptable by the EPA.
01/20/2012 This report presents the results of area air and sub-slab air sampling conducted for the General
Services Administration (GSA) at the Bannister Federal Complex (BFC), specifically Building 4,
located at 1500 East Bannister Road, Kansas City, Missouri.
Contaminant migrations may exist through perforations in the building foundation slab.
However, based on identified contaminant concentrations identified in the indoor air and crawlspace samples collected, it does not appear that contaminants are migrating to the employee-occupied spaces located above the crawlspace at concentrations above the Site-Specific Screening Levels.
01/11/2012 Quarterly  Groundwater Monitoring Well Sampling Report Buildings 1 & 2 Based on the results of ground water sampling,vinyl chloride and n-Nitrosodi-n-propylamine are present on-site above the EPA Risk Screen Level for tap water.
2011
12/22/2011 Area Air and Sub-Slab Air Quarterly Monitoring Report Buildings 1 and 2. Based on the results of the slab, indoor, and ambient air sampling, continued quarterly air sampling for VOCs, per the site specific Work Plan/QAPP. The calculated cancer risks levels for the identified PCBs are within the range that is considered acceptable by the EPA.
12/13/2011 Area Air and Sub-Slab Air Quarterly Monitoring Report Buildings 1 and 2. Based on the results of the quarterly sub-slab, indoor, and ambient air sampling performed to-date, Terracon recommends continued quarterly air sampling for VOCs, per the site specific Work Plan/QAPP.
11/11/2011 Quarterly  groundwater Monitoring Well Sampling Report Buildings 1 & 2. Based on the results of the  groundwater sampling, vinyl chloride is present
on-site above the EPA Risk Screening Level for tap water.
07/25/2011 Buildings 1 & 2 Groundwater Monitoring Well Sampling Report. Based on the results of the April 2011 groundwater sampling event, vinyl chloride is present on-site above the EPA RSL for Tapwater
07/01/2011 Building 1 & 2 Groundwater Monitoring Well Sampling Report. Based on the results of the January 2011 groundwater sampling event, vinyl chloride is present on site above the EPA RSL for Tapwater.
06/30/2011 Area Air and Surface Dust Monitoring Report. Air monitoring results do not indicate concentrations of beryllium,uranium, or yttrium at concentrations above the laboratory reporting limits.The laboratory reporting limits did not exceed the applicable EPA Industrial RSLs.
06/16/2011 This document contains a report from the General Services Administration on limited removal from utility tunnel between Buildings 1 and 50. Limited removal of PCBs from unoccupied space. Subsequent air testing clear.
02/16/2011 This document is U.S. Department of Agriculture's results of an air quality assessment in their subbasement office space. Results show no beryllium and no elevated levels of any other contaminant.
02/01/2011 This document is the results of an indoor air quality assessment performed as part of an ongoing safety and environmental management plan. Mold was detected above normal levels. Abatement of moldy materials was subsequently performed. Other results were:  All buildings acceptable.
01/24/2011 This document is the results of an Indoor Air Quality Assessment performed as part of ongoing safety and environmental mgmt. All building readings were within current acceptable guidelines.
01/11/2011 This document is the results of a drinking water sample taken in room P04A2. Report shows no elevated levels of chemicals present.
2009
  There are no documents for the year 2009.  
2008
  There are no documents for the year 2008.  
2007
12/18/2007 This document is the results of a mold sampling in the Deputy RA's Office.  
12/06/2007 This document is the results of a Defense Finance and Accounting Services mold test.  
08/28/2007 This document is the results of Indoor Air Quality  testing in Building 2 on the second floor.  
8/15/2007 This document contains Indoor Air Quality results for Room 1186  at Bannister.  
08/15/2007 This document describes elevated skin cell fragment levels in office areas at Bannister.  
08/15/2007 This document contains the results of Indoor Air Quality testing.  
06/25/2007 This document is results of testing conducted in Room 1116 at the Bannister Federal Complex.