Construction Progress Photos 10-30-12
-
The material covering the new secondary inspection area allows natural light to pass, thereby reducing the need for artificial daytime lighting.
-
The new southbound pedestrian crossing on the east side of the port has been completed and is currently operational.
-
Construction on brand new double-stacked inspection booths in lanes 17 through 24 has been completed and are currently operational.
album,construction,lpoe,pic,picture,photo,san ysidro,sylpoe