FINDINGS #08, December 2013

 

GSA recently assessed 63 of its most recent on-site photovoltaic (PV) solar projects and produced a robust resource titled On-Site PV Guidance. GSA concluded that the most successful projects established an integrated project team at the outset, enabling early discovery of potential challenges and allowing for modifications in design and scheduling to be made at minimum cost to the project. Click on the infographic below to enlarge.

GPG Findings 08, December 2013, On-Site Photovoltaic Guidance. Opportunity: How is GSA meeting federal mandates for renewable energy? 7.5% Federal mandate goal for renewable energy. 13.2% GSA renewable energy purchased. 1% solar energy production from GSA buildings. Additional .05% from wind and geothermal. Technology: How was the study conducted? Policy review; surveys and interviews with project teams. Measurement and Verification: Where did M and V occur? National Renewable Energy Laboratory collected best practices and lessons learned from 63 of the 74 GSA PV installations nationwide. Results: What did we learn in M and V? Diverse portfolio. System capacity ranged from 10KW to 5MW. Challenges numerous and universal. Project management, site interconnection, technical, and economic. Risks mitigated by advance planning and project management. For more information: Where to find additional information? On-Site PV Guidance Report. Lessons Learned and Best Practices available at gsa.gov/gpg.


Reference above to any specific commercial product, process or service does not constitute or imply its endorsement, recommendation or favoring by the United States Government or any agency thereof.
 

 

READ 4-page FINDINGS

Thumbnail image for PV Guidance Findings report

Findings: PV
Guidance >

DOWNLOAD FULL REPORT

Cover for PV Guidance Report

PV
Guidance >


GPG Technologies findings PV Guidance