OPM continues to work with GSA to develop OPM’s space-related requirements, in order to determine the best long-term housing strategy for the agency's facility in the Iron Mountain mine, located in Boyers, PA.

Over the past 40+ years, OPM has occupied space at Iron Mountain. Since that time, OPM's mission and space needs have changed significantly. Existing offices within the mine now occupy over 400,000 square feet across six leases, housing approximately 2,000 Federal employees and contractors.

The collaboration with GSA and other industry experts has helped verify OPM's needs and key workplace characteristics, through the analysis of their mission, business processes, space standards, and future goals. The team has determined the most effective and efficient solution for OPM's long-term housing needs is to move operations from the mine.

The geographic area OPM is pursuing - the delineated area (see below) - includes most of Butler County, and portions of Beaver and Lawrence counties. The delineated area was designed to maintain the existing workforce, minimize operational disruption, remain within the existing locality pay band, and maximize competition within the market. The actual location within the delineated area will be determined by a competitive acquisition process.

GSA has held conversations with the local economic development groups in Beaver, Butler, and Lawrence counties for input on current and future activities in their areas.

Recently, the U.S. Department of Veterans Affairs (VA) approached GSA regarding their site in Butler, Pennsylvania. The VA and GSA, in coordination with OPM, are investigating the VA Hospital as a potential option for OPM’s long-term space requirement. The team is evaluating the best path forward regarding the site acquisition and associated Expressions of Interest Advertisement, as well as the viability of the VA site. This is a lengthy process which involves complex reviews and analysis. Throughout this process, GSA will continue to work closely with OPM.

As the project moves forward, updates will be provided on this page.