Calexico West LPOE Design

The project will be constructed in two phases.

Phase 1 consists of:

  • Three southbound privately owned vehicle (POV) lanes;
  • A southbound bridge over the New River;
  • 10 northbound POV inspection lanes with primary and secondary inspection canopies;
  • Booths and inspection equipment;
  • A new administrative building (command center); and
  • Sitework to accommodate those facilities on the sloping site.

Phase 2A will include:

  • Additional sitework;
  • six (6) additional NB POV inspection lanes, canopies and booths;
  • a NB Pre-Primary inspection Canopy, additional NB Secondary Inspection Canopy, five (5) SB POV inspection lanes, canopies and booth;
  • administration building;
  • parking structure, and all associated facilities with POV processing

Phase 2B will include:

  • Demolition of the existing port building;
  • A new pedestrian processing facility