Calexico West LPOE Design

The project will be constructed in two phases.

Phase 1 consisted of:

  • construction of privately owned vehicle inspection facilities;
  • new southbound vehicle lanes and a bridge over the New River;
  • a new administrative building (command center) to supervise the non-commercial vehicle inspection area

Phase 2A will include:

  • sitework;
  • construction of a new administration building;
  • increasing vehicle secondary canopy inspection areas from nine to 15;
  • expanding new northbound vehicle lanes from 10 to 16;
  • providing five new southbound vehicle lanes, inspection booths, and canopy area;
  • and the addition of a secure employee parking area

Phase 2B will include:

  • demolition of the existing port building;
  • and a new and expanded pedestrian processing facility.

Last Reviewed: 2021-03-08