Statement of Work
GSA has several standard Statements of Work (SOW) for the acquisition of BIM related services. The base AE Statement of Work is based on work by several of GSA's Regions. This base SOW is to be used in conjunction with one or both of the other SOWs.
AE Services Statement of Work
Standard AE SOW for Prospectus- Level Projects using the CMc Delivery Method based on a standard developed from many Regions within GSA. Although the current SOW includes BIM specific requirements, it is still recommended that it be used in conjunction with the BIM SOW.
- AE Services Statement of Work Download and User Guide (Under Development)
BIM Statement of Work
The Base BIM SOW is for Prospectus & Non-Prospectus - Level Projects using the Collaborative GC Delivery Method. This is the main BIM addendum to the base AE SOW. It is to be issued in conjunction with the standard SOW on all GSA projects with a BIM requirement. As the primary AE Services Statement of Work continues to evolve, care must be taken to ensure that overlaps and contradiction do not occur between the BIM addendum and primary scope of work.
3D Imaging Statement of Work
3D Imaging Services SOW for Prospectus & Non-Prospectus - Level Projects using Scan and Model Delivery Methods.