This project will deliver a new land port complex to supplement the existing LPOE in Fort Fairfield, Maine. The current LPOE is obsolete and cannot accommodate modern inspection and border security technologies. The existing facility is undersized and outdated as it relates to mechanical, electrical and plumbing systems. When completed, the new LPOE will provide adequate operational space, reduced traffic congestion, and safe conditions for employees and travelers.
The Architect-Engineering team submitted the Final Concept, which received approval from CBP and PBS leadership on 11/9/2026 following a comprehensive review of project requirements, design specifications, and adherence to all applicable codes and standards. This review also encompassed evaluations of sustainability objectives, site constraints, budget compliance, and risk factors. Upon approval, the project transitioned into the Design Development phase on 11/10/2026. During this phase, the team is responsible for developing detailed architectural drawings, advancing interior layouts, and coordinating all building systems—including mechanical, electrical, plumbing, and structural elements. Regular interdisciplinary meetings are held to address technical challenges, integrate feedback from key stakeholders, and ensure all user requirements are met. The team also prepares preliminary cost estimates, conducts constructability reviews, and initiates the identification of long-lead procurement items. The Design Development phase is scheduled for completion on 3/31/2027, after which the project will advance to the Construction Documents phase, where final plans and specifications will be prepared for bidding and construction.
Environmental review
In compliance with NEPA, GSA has prepared a Draft Environmental Assessment, which examines potential environmental impacts from modernization and expansion of the Fort Fairfield Land Port of Entry. A public meeting to discuss the Draft Environmental Assessment took place on Tuesday, June 10, 2025, at the Fort Fairfield Middle High School Cafeteria (28 High School Drive, Fort Fairfield, ME 04742).
The final Environmental Assessment is currently scheduled to be published in late 2025.
We received $3.4 billion to invest in our nation’s infrastructure and competitiveness. The law provides funding for LPOE modernization projects that will create new good-paying jobs, bolster safety and security, and make our economy more resilient to supply chain challenges.
Community impact
This project will improve the conditions for economic, cultural, and familial connections. The people who live along the border depend on this deep, cross-border community engagement, often crossing through the ports daily for jobs, mutual aid, and everyday life.
PER DIEM LOOK-UP
1
Choose a location
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Get my location
OR
OR
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Traveler reimbursement is based on the location of the work activities and not the accommodations,
unless lodging is not available at the work activity, then the agency may authorize the rate where
lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely
surrounded by, the corporate limits of the key city, including independent entities located within
those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely
surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties,
including independent entities located within the boundaries of the key city and the listed counties
(unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is
located partially within more than one city or county boundary, the applicable per diem rate for the
entire installation or facility is the higher of the rates which apply to the cities and / or counties,
even though part(s) of such activities may be located outside the defined per diem locality.