Skip to main content

An official website of the United States government

Here’s how you know

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( Lock A locked padlock ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

GSA 250 year anniversary logo and seal U.S. General Services Administration
    • Explore buy through us
    • Category management
    • Government property for sale or lease
      Toggle submenu
      • Personal property (tangible goods)
      • Vehicle sales
    • Products and services
      Toggle submenu
      • Human capital
      • Industrial products and services
      • Office management
      • Professional services
      • Security and protection
      • Transportation and logistics services
    • Purchasing programs
      Toggle submenu
      • Assisted acquisition
      • Commercial platforms
      • Emergency acquisition basic ordering agreements
      • Federal strategic sourcing initiative
      • Fleet management
      • Governmentwide acquisition contracts
      • HCaTS and HCaTS SB
      • Multiple award schedule, or MAS
      • OASIS and OASIS SB
      • OneGov
      • Requisition programs
    • Shared services
      Toggle submenu
      • Payroll services
      • Support services for CABs

    Featured Topics

    • Auctions Federal assets available via auction to the general public.
    • Explore sell to government
    • Step 1: Learn about government contracting
      Toggle submenu
      • Ways you can sell to government
      • How to access contract opportunities
      • Conduct market research
    • Step 2: Compete for a contract
      Toggle submenu
      • Register your business
      • Certify as a small business
      • Become a schedule holder
      • Market your business
      • Research active solicitations
      • Respond to a solicitation
      • What to expect during the award process
    • Step 3: Manage your contract
      Toggle submenu
      • Comply with contractual requirements
      • Handle contract modifications
      • Monitor past performance evaluations

    Featured Topics

    • Contract opportunities on SAM.gov Search current federal contract opportunities and procurement notices.
    • Forecast of contracting opportunities Anticipated contracts offered by GSA.
    • Vendor support center Research the federal market, report sales, and upload contract information.
    • Explore real estate
    • Assets identified for accelerated disposition
    • Child care services
      Toggle submenu
      • Find a child care center
    • Leasing
      Toggle submenu
      • Leasing guidance
      • Leasing tools
    • Occupancy Agreement Space Inventory System, or OASIS
    • Portfolio and occupancy space planning
    • Reimburseable services program
      Toggle submenu
      • eRETA RWA customer portal
      • eRETA user account request process
    • Water quality management
    • Workplace optimization
      Toggle submenu
      • Commercial coworking
      • Offerings
    • USE IT Act and occupancy data
      Toggle submenu
      • Playbook: Federal daily check-in survey
      • Playbook: Laptop occupancy data
    • Utility services

    Featured Topics - Real Estate

    • Real property disposal Dispose or acquire excess federal real property including buildings or land.
    • Explore policy and regulations
    • Acquisition policy
    • Aviation management policy
    • Federal Advisory Committee Act management
    • Information technology policy
    • Real property management policy
    • Travel management policy
    • Regulations
      Toggle submenu
      • Federal acquisition regulations
      • Federal management regulations
      • Federal travel regulations

    Featured Topics

    • Forms Search for a government form.
    • Per diem FAQs Frequently asked questions about per diem rates and related topics.
    • USE IT and occupancy data annual reports Search the annual reports CFO Act agencies submitted for USE IT occupancy data requirements.
    • Explore small business
    • Find opportunities
    • Get help
    • How to do business with us
    • Key resources
    • Programs and eligibility
    • Register your business

    Featured Topics

    • Forecast tool Information on planned federal contracting opportunities.
    • Socio economic categories Check your eligibility for small-business set-asides.
    • Training resources Suggested training for doing business with us.
    • Explore travel
    • Plan a trip
      Toggle submenu
      • Per diem rates
      • Transportation (airfare rates, POV rates, etc.)
      • Lodging
      • Travel charge card
    • Travel and lodging services
      Toggle submenu
      • E-gov travel service (ETS)
      • Rideshare
      • Travel category schedule
    • Federal travel regulation

    Featured Topics

    • Per diem rates look-up Allowances for lodging, meal and incidental costs while on official government travel.
    • Mileage reimbursement rates Reimbursement rates for the use of your own vehicle while on official government travel.
    • Explore technology
    • Purchasing programs
      Toggle submenu
      • Cloud computing services
      • Cybersecurity products and services
      • Governmentwide acquisition contracts
      • MAS information technology
      • USAccess
    • Government initiatives
      Toggle submenu
      • Artificial Intelligence
      • Cybersecurity
      • Emerging citizen technology
      • FedRAMP
      • Federal identity, credentials, and access management
      • Robotic process automation community
      • Technology modernization fund

    Featured Topics

    • Data.gov Access U.S. government data.
    • Multiple award schedule IT category Information technology products, services and solutions.
    • Explore About GSA
    • Background and history
      Toggle submenu
      • Overview
      • Mission and strategic goals
      • Role in presidential transitions
    • Careers
      Toggle submenu
      • Discover special hiring paths
      • Elevate your professional career
      • Get an internship
      • Launch your career
      • Resources and related links
    • Contact us
      Toggle submenu
      • Request a speaker
    • Events and training
    • Leadership directory
      Toggle submenu
      • Federal Acquisition Service
      • Public Buildings Service
      • Staff offices
    • Newsroom
      Toggle submenu
      • Agency blog
      • Congressional testimony
      • News releases
      • Speeches
      • Videos

    Featured Topics

    • Blog Read the latest GSA news, updates and analysis.
    • Careers Learn what we have to offer.
  • Per diem lookup
Buy through us
Explore buy through us
Category management
Government property for sale or lease
Personal property (tangible goods)
Vehicle sales
Products and services
Human capital
Industrial products and services
Office management
Professional services
Security and protection
Transportation and logistics services
Purchasing programs
Assisted acquisition
Commercial platforms
Emergency acquisition basic ordering agreements
Federal strategic sourcing initiative
Fleet management
Governmentwide acquisition contracts
HCaTS and HCaTS SB
Multiple award schedule, or MAS
OASIS and OASIS SB
OneGov
Requisition programs
Shared services
Payroll services
Support services for CABs
Sell to government
Explore sell to government
Step 1: Learn about government contracting
Ways you can sell to government
How to access contract opportunities
Conduct market research
Step 2: Compete for a contract
Register your business
Certify as a small business
Become a schedule holder
Market your business
Research active solicitations
Respond to a solicitation
What to expect during the award process
Step 3: Manage your contract
Comply with contractual requirements
Handle contract modifications
Monitor past performance evaluations
Real estate
Explore real estate
Assets identified for accelerated disposition
Child care services
Find a child care center
Leasing
Leasing guidance
Leasing tools
Occupancy Agreement Space Inventory System, or OASIS
Portfolio and occupancy space planning
Reimburseable services program
eRETA RWA customer portal
eRETA user account request process
Water quality management
Workplace optimization
Commercial coworking
Offerings
USE IT Act and occupancy data
Playbook: Federal daily check-in survey
Playbook: Laptop occupancy data
Utility services
Policy and regulations
Explore policy and regulations
Acquisition policy
Aviation management policy
Federal Advisory Committee Act management
Information technology policy
Real property management policy
Travel management policy
Regulations
Federal acquisition regulations
Federal management regulations
Federal travel regulations
Small business
Explore small business
Find opportunities
Get help
How to do business with us
Key resources
Programs and eligibility
Register your business
Travel
Explore travel
Plan a trip
Per diem rates
Transportation (airfare rates, POV rates, etc.)
Lodging
Travel charge card
Travel and lodging services
E-gov travel service (ETS)
Rideshare
Travel category schedule
Federal travel regulation
Technology
Explore technology
Purchasing programs
Cloud computing services
Cybersecurity products and services
Governmentwide acquisition contracts
MAS information technology
USAccess
Government initiatives
Artificial Intelligence
Cybersecurity
Emerging citizen technology
FedRAMP
Federal identity, credentials, and access management
Robotic process automation community
Technology modernization fund
About GSA
Explore About GSA
Background and history
Overview
Mission and strategic goals
Role in presidential transitions
Careers
Discover special hiring paths
Elevate your professional career
Get an internship
Launch your career
Resources and related links
Contact us
Request a speaker
Events and training
Leadership directory
Federal Acquisition Service
Public Buildings Service
Staff offices
Newsroom
Agency blog
Congressional testimony
News releases
Speeches
Videos
  1. Home
  2. Real estate
  3. Technical Procedures
  4. Clay roof tile repair and reattachment

Clay roof tile repair and reattachment

CSI Division: Thermal and Moisture Protection
Specification ID: HP070120
Materials: Roofing, repairs, clay tile
Last Modified: 07/01/2026

 Disclaimer

Technical procedures are supplied by GSA only as a reference. All procedures have been reviewed for general consistency with federal standards for rehabilitating historic buildings. Specifications should only be applied under the guidance of a qualified preservation professional who can assess the applicability of a procedure to a particular building, project or location.

References to products and suppliers serve as general guidelines and do not constitute a federal endorsement nor a determination that a product or method is the best alternative or compliant with current environmental regulations and safety standards.

Part 1 – General

1.01 Description

  1. This specification provides guidance for the repair and reattachment of clay roof tiles.
    1. This specification has been developed for use on historic properties (defined as any district, site, building, structure, or object that is listed in or eligible for listing in the National Register of Historic Places) and provides an overview of accepted practices. Site-specific specifications, when appropriate, will be provided by the Architect.
    2. All work described herein and related work must conform to the Secretary of the Interior’s Standards for the Treatment of Historic Properties.
    3. The Contractor shall provide all labor, material, equipment, and operations required to complete the rehabilitation work indicated herein.
    4. All work described herein and related work must have the approval of a Cultural Resources Manager, Conservator, Historic Architect, or other professional who meets the standards outlined in the Secretary of the Interior’s Standards – Professional Qualifications Standards pursuant to 36 CFR.

1.02 Section includes

  1. Removal and reattachment of loose tiles
  2. Replacement of damaged tiles

1.03 Related sections

  1. Section 013510 for general historic preservation project guidelines to be reviewed along with this procedure. These guidelines cover the following sections and should be reviewed prior to performing this procedure and should be followed, when applicable, along with recommendations from GSA Historic Preservation:
    1. Safety Precautions
    2. Historic Structures Precautions
    3. Submittals
    4. Quality Assurance
    5. Delivery, Storage and Handling
    6. Project/Site Conditions
    7. Sequencing and Scheduling
    8. General Protection (Surface and Surrounding)
    9. Historic Building Treatment Procedures

1.04 Quality assurance

  1. The contractor performing the work described in this section shall have a minimum of five years experience in repair and installation of historic clay tile roofing and shall have successfully completed at least three projects of similar scope within the previous five years. He/she shall demonstrate a working knowledge of The Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring & Reconstructing Historic Buildings.
  2. Warranty: The contractor shall provide a written warranty for the clay tile roof repairs against failures in materials and workmanship for a period of five years after the date of substantial completion.

1.05 Submittals

  1. The contractor shall submit to the architect or GSA Approving Official:
    1. A detailed description and schedule for repair of clay roof tiles including annotated drawings and/or photographs of areas to be repaired. A complete external and internal inspection is required prior to submittal. The inspection will also aid in determining a future maintenance plan. Prepare a narrative description of procedures to be used for protection of the existing roof, removal of tiles and installation/reinstallation of roof tiles.
    2. The manufacturer’s product literature for all proprietary products specified for clay tile roof repairs including replacement tiles, cements, mortars and metal fabrications. Product literature shall include specification data, Safety Data Sheets (SDS), and instructions for storage, handling, and use.
    3. A project safety plan to include at minimum: any personal protective equipment to be used by the contractor’s staff such as disposable clothing, gloves and safety glasses, procedures for emergencies and accidents, documentation of staff training in use of equipment and/or chemical products as required by the manufacturers.
  2. The contractor shall submit samples of the following items to be used in the repair work.
    1. Replacement roof tiles: Submit samples of replacement roof tiles. Samples shall illustrate the full range of color variation to be expected. Salvaged or replacement clay tile that matches existing tiles should be used for replacement. Modern tiles or cement-based tiles are not an appropriate substitute for historic clay tile.
    2. Fasteners: Submit samples of nails, bibs, clips and other metal fasteners to be used in the attachment of the new roof tiles.

1.06 Testing and mockups

  1. Contractor, at inconspicuous locations designated by the Project Team and GSA Historic Preservation, shall perform small test patches (no larger than 6 inches by 6 inches) for all products to be used. Testing will determine the best method(s) to perform the work and ensure that the chosen products do not cause harm.
  2. Following testing, mockup panels shall be created (mockup panels may incorporate successful test patches) using the chosen methods. Size and location of mockup panels shall be determined by the project Team and GSA Historic Preservation.
  3. In the presence of the architect, all personnel to be assigned to the project shall demonstrate their ability to complete the required work in an acceptable manner. Each mechanic shall remove and replace one clay roof tile at locations designated by the architect. Personnel not completing the sample work in an acceptable manner shall not be permitted to work on the roofing repairs.
  4. The methods used, their application, etc. shall be in accordance with manufacturer’s instructions.
  5. The mockup shall include an evaluation of the materials and techniques proposed for the protection of surrounding areas and materials.
  6. Approved mockups shall become part of the work and shall serve as the quality standard for all similar work.
  7. Any testing, demonstrations, or mockup that is rejected by the project team shall be removed in its entirety without damage to the surrounding masonry and a new demonstration/mockup shall be performed for the project team’s review.

1.07 Delivery, storage, and handling

  1. The Contractor shall:
    1. Deliver clay roof tiles and accessory materials to the site in manufacturer’s original unopened packaging with identification information visible thereon.
    2. Store field tiles on pallets away from general construction operations until ready to begin installation. Special shapes must be stored in manufacturer’s original packaging. Store roof tiles in such a manner as to avoid unnecessary handling.
    3. Store accessory materials such as mastic, adhesives, membranes, etc., off the ground in a dry, secure location where ambient temperatures are within the manufacturer’s recommended range.
    4. Provide power equipment as required to safely move tiles to the roof in preparation for installation.  Outside storage is acceptable for power equipment.
    5. The contractor shall dispose of all packaging, waste materials and construction debris in accordance with local, state and federal environmental regulations. All wood scrap shall be kept separate for recycling. No burning of debris, waste material or trash will be allowed on site.
    6. Where possible, clay tiles removed from the roof shall be salvaged for reinstallation. Stockpile salvaged tiles in a location designated by the owner’s representative. Store salvaged tiles on pallets, off the ground. Do not stack pallets.

1.08 Safety

  1. The contractor shall only use chemical products whose safety data sheets (SDS) have been reviewed and considered acceptable by the government. Any project surfaces containing lead-based paint, as disclosed by the government, shall be handled by the contractor in accordance with OSHA (29 CFR 1926.62), EPA (40 CFR 261) and state regulations. Any lead-based paint or coating that is removed in a project resulting from this scope shall undergo Toxicity Characteristic Leaching Procedure (TCLP) testing by the contractor. The contractor shall dispose of any lead waste as hazardous if it fails the TCLP.
  2. The contractor shall isolate the work area with cones, tape or similar means as possible for the duration of the project, to prevent unauthorized individuals from entering. At least one entrance must remain accessible during the course of the work.
  3. For any work required on elevated surfaces (4 feet or more above the ground) the contractor shall install and use any ladders, scaffolding or platforms in accordance with OSHA regulations (29 CFR Subpart M).

1.09 Project/site conditions

  1. The contractor is responsible for protecting existing adjacent materials during the execution of the work. Provide all necessary protection and work procedures to avoid damage to existing material assemblies not a part of the work of this Section. At a minimum, the contractor shall:
    1. Provide sturdy, weather-proof protection at all areas exposed during clay tile roof repairs and installation. Do not leave interior spaces exposed to the elements overnight. The contractor shall maintain adequate supplies of protective materials on site at all times in the event of sudden weather changes.
    2. Protect roof framing during clay tile installation by distributing materials in such manner as to avoid overloading.
    3. Protect new and existing clay tile roofing by limiting foot traffic over installed tile and ensuring the use of proper soft-soled footwear by all roofing personnel. Use sand bags, planks, suspended ladders and/or platforms where possible to avoid damage to roof surfaces.
    4. Protect roofing and gutters from damage by ladders or work platforms. Keep gutters clear of debris from clay tile repair work.
  2. The contractor shall coordinate roofing work with the work of other trades to minimize delays in the construction process. Coordinate roofing with other work including, but not limited to, structural framing, exterior finish carpentry, flashing and gutter work and chimney restoration. Schedule roof work to avoid traffic by other trades over newly installed areas.
  3. All contractor personnel performing treatment operations shall be provided by the contractor with gloves, respirators, protective clothing and any other personal protective equipment (PPE) as recommended by the manufacturer of the products used during the work and required by local, state, and federal regulations. Rubber sole shoes with non-slip tread shall be worn on the roof.

Part 2 – Products

2.01 Manufacturers

  1. The tile product and manufacturer must be pre-approved by the project team.
  2. For repair projects, the contractor shall have the option of providing salvaged roof tile, subject to approval of submitted samples, if this provides a better match to the existing roof materials.
  3. Where necessary, tiles may be removed from inconspicuous areas of roof and relocated to patch more visible areas to ensure the best match. Areas for tile removal must be pre-approved by the project team and/or GSA Historic Preservation.

2.02 Materials

  1. Tile:
    1. Salvage tile to match existing in good condition.
    2. Incombustible, vitrified tile manufactured from shale and fire clays, having less than two percent moisture absorption when tested in accordance with ASTM C 67, and meeting Grade 1 freeze/thaw resistance requirements when tested in accordance with ASTM C 1167. No substitute materials such as pigmented concrete, metal, or plastic shall be accepted.
    3. Historic tile roofs often incorporated variations in tile exposure and size to compensate for the effects of perspective when viewed from the ground. When attempting to match existing tiles, the contractor shall note variations in size and exposure in the historic tile and procure replacements to fit accordingly.
  2. Shapes and Fittings:
    1. Supply special shapes and fittings of same material and finish as adjacent field tile, factory-formed before firing, as indicated on drawings or specified in manufacturer’s instructions for project conditions including, but not limited to, the following: Hip caps, ridge caps, rake edges, detached gable rake edges, eave edges, valley edges, termination caps, half tile, end bands.

2.03 Accessory materials

  1. New sheet metal for forming clips shall be 26 gauge Type 304 dead soft stainless steel coated with 50 percent zinc and 50 percent tin alloy to a thickness of 20 microns (TCS II).
  2. Underlayment: Where sheathing is present, asphalt-saturated organic felt conforming to ASTM D 226, Type II, non-perforated. Nominal weight 30 pounds per 100 square feet (1.5 kg/sq m); two layers required.
  3. Wood:
    1. Wood Stringers: S4S, maximum 19 percent moisture content, nominal one inch (25 mm) thick, of height required to support tile.
    2. Wood Nailers and Cant Strips: Preservative-treated wood.
  4. Flashing: As specified by project architect and approved by GSA Historic Preservation.
  5. Tile Fasteners: Corrosion-resistant; types and sizes specified in manufacturer’s instructions for indicated uses and conditions.
  6. Mortar Materials
    1. Mortar or grout is not a substitute for weatherproof tile repairs. Sometimes a dab of mortar is added for extra stability or to deter wind-blown rain.
    2. Mortar for setting tile and grout for finishing rake and eave edges, if used, shall have comparable flexibility and always be lower in strength and permeability than the tile itself. Mortar mixes must be approved by the Architect.
  7. Sealants and adhesives: Waterproofing compounds are not appropriate for use on clay tile.

2.03 Equipment

  1. Rule or Tape
  2. Hammer
  3. Chipping Hammer
  4. Sponge
  5. Fox-tail Broom
  6. Caulking Gun
  7. Slate Ripper
  8. Drill and Glass Drill Bits

Part 3 - Execution

3.01 Examination

  1. Examine all existing tile prior to the start of work. Note any tile that can remain or be reinstalled.
    1. Whenever possible, perform inspection from ground or from above if possible. Inspect for:
      1. Biological growth: Inspect for dirt build-up, biological attack, mold, fungus. Also inspect for buildup of debris and vegetation such as moss or lichen. Heavy coatings of any type form dams and stop natural drainage, resulting in various types of deteriorations. This is more apt to occur on north slopes.
      2. Individual tiles: Inspect tile ridge details and starter courses for missing, loose, broken, or out of place tiles.
      3. Wear: Excessive weathering, spalling or staining indicating weathering and age. Tile movement may be detected by unusually clean areas (lack of stains). Movement is often a sign of failed fastenings.
      4. Leaks: Inspect the underside of the roof deck from the attic to detect leaks. Flashings are the most vulnerable points. Therefore, inspect the underside carefully at all flashing points and along the downhill side of any roof penetrations for evidence of leakage such as water stains.
  2. Examine all framing, sheathing and lath, where applicable, for any conditions that may affect the repair and reinstallation of the clay tile roofing. Notify the architect if any framing and/or decking is found to be unsuitable for roofing. The absence of sheathing is not necessarily unsuitable. If sheathing was historically absent on the roof, the repairs should be conducted in the same manner.

3.02 Preparation

  1. Roofing contractor to coordinate roof repairs with chimney restoration, carpentry, flashing and gutter work if required to ensure that structural repairs are completed and eave configurations and tile projections are suitable to receive new gutter work and that flashings and other items may be installed prior to tile installation.
  2. The roofing contractor shall transport and stage tiles in such a way as to avoid overloading the roof framing during installation.
  3. Protect roof tiles to remain using sandbags, planks, or padded ladders as required to distribute the weight of personnel required to access the roof. Do not walk over roof tiles unnecessarily.
  4. Where roofing to remain is too fragile for foot traffic, remove tiles as required to create a path to the repair area. Salvage all sound tiles for reinstallation.
  5. Carefully examine, measure, and record existing tile patterns at edges, hips, ridges, and other special conditions. Measure the exposed dimensions and amount of lap of each type piece prior to the removal, as well as length, width, and thickness after removal.

3.03 Removal of existing roof tiles

  1. Salvaging a Broken or Loose Tile: If the shingle tile is broken at the nail hole, salvage the tile by carefully drilling a new hole with a carbide-tip drill and nailing the tile in place with a hammer so that the tile “hangs” on the nail.
  2. Remove slipped or mismatched tile(s) using a hacksaw blade or slate ripper to cut the nails or wire ties. Gently remove the tile(s) without damaging the edges of adjacent tiles to remain. Broken tiles may be cracked with a mallet to facilitate removal.
  3. Where flashing and/or gutter replacement is required, remove all tiles covering the full extent of the metalwork to be replaced.

3.04 Replacement tile installation

  1. Sound all tiles prior to installation by tapping lightly. All tiles should ring clear. Tiles that rattle or produce a muffled sound when tapped are likely defective and shall not be used.
  2. Nails shall not be driven so as to produce strain on tiles. Nails shall be driven so that the head protrudes slightly from the surface of the tile. The tile shall be loose when fully nailed. If this is not executed properly, building movement could crack the tile.
  3. Some early tiles utilize only their hook shape to secure themselves to the roof lath or battens. The original installation should be used unless the architect confirms that the method is causing roof damage. If the architect deems appropriate, spot replacement of damaged, missing or non-matching tile may be done by one of the following methods:
    1. Clip Method
      1. A noncorrosive sheet metal strip is nailed in place underneath the location where the replacement tile will be installed. The strip shall be long enough to protrude several inches below the bottom edge of the replacement tile. Fold the exposed portion of the strip to double thickness.
      2. Slide the replacement tile into position. Hold in place by folding the doubled sheet metal strip and crimping tight to the bottom edge of the tile.
    2. Hook Method
      1. A pre-formed wire or non-corrosive sheet metal hook is placed over the top edge of the course beneath the tile to be replaced.
      2. Slide the new tile into position under the course above, bending the bottom of the sheet metal/wire hook up and over the bottom edge of the tile.
    3. Nail and Tie Method
      1. Where multiple tiles are removed, reinstall using nails or wire ties fastened to nails driven directly into the roof deck or battens.
  4. Replacement ridge tiles shall be laid in to match the pattern of the remaining tiles.
  5. Entire surfaces of all roofs, except as noted, shall be covered with tile in a proper and weatherproof manner. Upon completion, all tiles must be sound, whole and clean. The roof must be left watertight and neat in every respect, and subject to the Architect’s approval. 

3.05 Final report

  1. The Contractor Shall:
    1. Provide a final report of completed work, including all approved submittals and photographs of the areas cleaned that were taken before, during, and after the work.
    2. Provide a written summary of the project and results upon final inspection and approval. The summary shall include a discussion of steps taken or new findings not specified in the initial documentation. Summary should also include any applicable ongoing care, repair and warranty requirements.

Technical Procedures Disclaimer
Prior to inclusion in GSA’s library of procedures, documents are reviewed by one or more qualified preservation specialists for general consistency with the Secretary of Interior Standards for rehabilitating historic buildings as understood at the time the procedure is added to the library. All specifications require project-specific editing and professional judgement regarding the applicability of a procedure to a particular building, project or location. References to products and suppliers are to serve as a general guideline and do not constitute a federal endorsement or determination that a product or method is the best or most current alternative, remains available, or is compliant with current environmental regulations and safety standards. The library of procedures is intended to serve as a resource, not a substitute, for specification development by a qualified preservation professional.

Rewrite
We’ve reviewed these procedures for general consistency with federal standards for rehabilitating historic buildings and provide them only as a reference. Specifications should only be applied under the guidance of a qualified preservation professional who can assess the applicability of a procedure to a particular building, project or location. References to products and suppliers serve as general guidelines and do not constitute a federal endorsement nor a determination that a product or method is the best alternative or compliant with current environmental regulations and safety standards.

Print Page Email Page
Last updated: Aug 31, 2026
Top

Home

  • Resources for …
    • Americans with Disabilities
    • Citizens and Consumers
    • Federal Employees
    • GSA Employees
    • Native American affairs
    • Presidential & Congressional Commissions, Boards or Small Agencies
    • Small Business
  • Governmentwide Initiatives
    • Centers of Excellence
    • Digital experience
    • Emergency response
    • Federal Cybersecurity
    • ID, Credentials, and Access Management
    • Information Quality
    • Open Data
    • Technology Modernization Fund
  • Contact us
    • Report a website issue
  • Organization
    • Leadership Directory
    • Staff Directory
  • References
    • Annual reports
    • Budget and Performance
    • Orders & Directives
    • Forms
  • Website Information
    • A-Z Index
    • Sitemap
  • Also of Interest
    • Data.gov
    • Whitehouse.gov
  • Tools
    • eBuy
    • eLibrary
    • Contracting forecast tool
    • GSA Advantage
    • GSA Auctions
GSA logo
  • Facebook
  • X
  • LinkedIn
  • Truth Social
  • YouTube
  • instagram
  • Blog
  • email

JOIN THE CONVERSATION

GSA.gov

An official website of the U.S. General Services Administration

  • Accessibility statement
  • Website Policies
  • Reports
  • Office of the Inspector General
  • No FEAR Act
  • FOIA Requests
  • Board of Contract Appeals
Looking for U.S. government information and services?
Visit USA.gov

PER DIEM LOOK-UP

1 Choose a location

Error, The Per Diem API is not responding. Please try again later.

No results could be found for the location you've entered.

Get my location

OR

OR

Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.

Rates for foreign countries are set by the Department of State.

2 Choose a date


OR

Rates are available between 10/1/2023 and 09/30/2026.

The End Date of your trip can not occur before the Start Date.

 
 
Additional terms and conditions

Traveler reimbursement is based on the location of the work activities and not the accommodations, unless lodging is not available at the work activity, then the agency may authorize the rate where lodging is obtained.

Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely surrounded by, the corporate limits of the key city, including independent entities located within those boundaries."

Per diem localities with county definitions shall include"all locations within, or entirely surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties, including independent entities located within the boundaries of the key city and the listed counties (unless otherwise listed separately)."

When a military installation or Government - related facility(whether or not specifically named) is located partially within more than one city or county boundary, the applicable per diem rate for the entire installation or facility is the higher of the rates which apply to the cities and / or counties, even though part(s) of such activities may be located outside the defined per diem locality.