Skip to main content

An official website of the United States government

Here’s how you know

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( Lock A locked padlock ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

GSA 250 year anniversary logo and seal U.S. General Services Administration
    • Explore buy through us
    • Category management
    • Government property for sale or lease
      Toggle submenu
      • Personal property (tangible goods)
      • Vehicle sales
    • Products and services
      Toggle submenu
      • Human capital
      • Industrial products and services
      • Office management
      • Professional services
      • Security and protection
      • Transportation and logistics services
    • Purchasing programs
      Toggle submenu
      • Assisted acquisition
      • Commercial platforms
      • Emergency acquisition basic ordering agreements
      • Federal strategic sourcing initiative
      • Fleet management
      • Governmentwide acquisition contracts
      • HCaTS and HCaTS SB
      • Multiple award schedule, or MAS
      • OASIS and OASIS SB
      • OneGov
      • Requisition programs
    • Shared services
      Toggle submenu
      • Payroll services
      • Support services for CABs

    Featured Topics

    • Auctions Federal assets available via auction to the general public.
    • Explore sell to government
    • Step 1: Learn about government contracting
      Toggle submenu
      • Ways you can sell to government
      • How to access contract opportunities
      • Conduct market research
    • Step 2: Compete for a contract
      Toggle submenu
      • Register your business
      • Certify as a small business
      • Become a schedule holder
      • Market your business
      • Research active solicitations
      • Respond to a solicitation
      • What to expect during the award process
    • Step 3: Manage your contract
      Toggle submenu
      • Comply with contractual requirements
      • Handle contract modifications
      • Monitor past performance evaluations

    Featured Topics

    • Contract opportunities on SAM.gov Search current federal contract opportunities and procurement notices.
    • Forecast of contracting opportunities Anticipated contracts offered by GSA.
    • Vendor support center Research the federal market, report sales, and upload contract information.
    • Explore real estate
    • Assets identified for accelerated disposition
    • Child care services
      Toggle submenu
      • Find a child care center
    • Leasing
      Toggle submenu
      • Leasing guidance
      • Leasing tools
    • Occupancy Agreement Space Inventory System, or OASIS
    • Portfolio and occupancy space planning
    • Reimburseable services program
      Toggle submenu
      • eRETA RWA customer portal
      • eRETA user account request process
    • Water quality management
    • Workplace optimization
      Toggle submenu
      • Commercial coworking
      • Offerings
    • USE IT Act and occupancy data
      Toggle submenu
      • Playbook: Federal daily check-in survey
      • Playbook: Laptop occupancy data
    • Utility services

    Featured Topics - Real Estate

    • Real property disposal Dispose or acquire excess federal real property including buildings or land.
    • Explore policy and regulations
    • Acquisition policy
    • Aviation management policy
    • Federal Advisory Committee Act management
    • Information technology policy
    • Real property management policy
    • Travel management policy
    • Regulations
      Toggle submenu
      • Federal acquisition regulations
      • Federal management regulations
      • Federal travel regulations

    Featured Topics

    • Forms Search for a government form.
    • Per diem FAQs Frequently asked questions about per diem rates and related topics.
    • USE IT and occupancy data annual reports Search the annual reports CFO Act agencies submitted for USE IT occupancy data requirements.
    • Explore small business
    • Find opportunities
    • Get help
    • How to do business with us
    • Key resources
    • Programs and eligibility
    • Register your business

    Featured Topics

    • Forecast tool Information on planned federal contracting opportunities.
    • Socio economic categories Check your eligibility for small-business set-asides.
    • Training resources Suggested training for doing business with us.
    • Explore travel
    • Plan a trip
      Toggle submenu
      • Per diem rates
      • Transportation (airfare rates, POV rates, etc.)
      • Lodging
      • Travel charge card
    • Travel and lodging services
      Toggle submenu
      • E-gov travel service (ETS)
      • Rideshare
      • Travel category schedule
    • Federal travel regulation

    Featured Topics

    • Per diem rates look-up Allowances for lodging, meal and incidental costs while on official government travel.
    • Mileage reimbursement rates Reimbursement rates for the use of your own vehicle while on official government travel.
    • Explore technology
    • Purchasing programs
      Toggle submenu
      • Cloud computing services
      • Cybersecurity products and services
      • Governmentwide acquisition contracts
      • MAS information technology
      • USAccess
    • Government initiatives
      Toggle submenu
      • Artificial Intelligence
      • Cybersecurity
      • Emerging citizen technology
      • FedRAMP
      • Federal identity, credentials, and access management
      • Robotic process automation community
      • Technology modernization fund

    Featured Topics

    • Data.gov Access U.S. government data.
    • Multiple award schedule IT category Information technology products, services and solutions.
    • Explore About GSA
    • Background and history
      Toggle submenu
      • Overview
      • Mission and strategic goals
      • Role in presidential transitions
    • Careers
      Toggle submenu
      • Discover special hiring paths
      • Elevate your professional career
      • Get an internship
      • Launch your career
      • Resources and related links
    • Contact us
      Toggle submenu
      • Request a speaker
    • Events and training
    • Leadership directory
      Toggle submenu
      • Federal Acquisition Service
      • Public Buildings Service
      • Staff offices
    • Newsroom
      Toggle submenu
      • Agency blog
      • Congressional testimony
      • News releases
      • Speeches
      • Videos

    Featured Topics

    • Blog Read the latest GSA news, updates and analysis.
    • Careers Learn what we have to offer.
  • Per diem lookup
Buy through us
Explore buy through us
Category management
Government property for sale or lease
Personal property (tangible goods)
Vehicle sales
Products and services
Human capital
Industrial products and services
Office management
Professional services
Security and protection
Transportation and logistics services
Purchasing programs
Assisted acquisition
Commercial platforms
Emergency acquisition basic ordering agreements
Federal strategic sourcing initiative
Fleet management
Governmentwide acquisition contracts
HCaTS and HCaTS SB
Multiple award schedule, or MAS
OASIS and OASIS SB
OneGov
Requisition programs
Shared services
Payroll services
Support services for CABs
Sell to government
Explore sell to government
Step 1: Learn about government contracting
Ways you can sell to government
How to access contract opportunities
Conduct market research
Step 2: Compete for a contract
Register your business
Certify as a small business
Become a schedule holder
Market your business
Research active solicitations
Respond to a solicitation
What to expect during the award process
Step 3: Manage your contract
Comply with contractual requirements
Handle contract modifications
Monitor past performance evaluations
Real estate
Explore real estate
Assets identified for accelerated disposition
Child care services
Find a child care center
Leasing
Leasing guidance
Leasing tools
Occupancy Agreement Space Inventory System, or OASIS
Portfolio and occupancy space planning
Reimburseable services program
eRETA RWA customer portal
eRETA user account request process
Water quality management
Workplace optimization
Commercial coworking
Offerings
USE IT Act and occupancy data
Playbook: Federal daily check-in survey
Playbook: Laptop occupancy data
Utility services
Policy and regulations
Explore policy and regulations
Acquisition policy
Aviation management policy
Federal Advisory Committee Act management
Information technology policy
Real property management policy
Travel management policy
Regulations
Federal acquisition regulations
Federal management regulations
Federal travel regulations
Small business
Explore small business
Find opportunities
Get help
How to do business with us
Key resources
Programs and eligibility
Register your business
Travel
Explore travel
Plan a trip
Per diem rates
Transportation (airfare rates, POV rates, etc.)
Lodging
Travel charge card
Travel and lodging services
E-gov travel service (ETS)
Rideshare
Travel category schedule
Federal travel regulation
Technology
Explore technology
Purchasing programs
Cloud computing services
Cybersecurity products and services
Governmentwide acquisition contracts
MAS information technology
USAccess
Government initiatives
Artificial Intelligence
Cybersecurity
Emerging citizen technology
FedRAMP
Federal identity, credentials, and access management
Robotic process automation community
Technology modernization fund
About GSA
Explore About GSA
Background and history
Overview
Mission and strategic goals
Role in presidential transitions
Careers
Discover special hiring paths
Elevate your professional career
Get an internship
Launch your career
Resources and related links
Contact us
Request a speaker
Events and training
Leadership directory
Federal Acquisition Service
Public Buildings Service
Staff offices
Newsroom
Agency blog
Congressional testimony
News releases
Speeches
Videos
  1. Home
  2. Real estate
  3. Technical Procedures
  4. Terrazzo Repair

Terrazzo Repair

CSI Division: Finishes
Specification ID:  HP096010
Materials: Terrazzo, cleaning, finishes
Last Modified: 07/01/2026

 Disclaimer

Technical procedures are supplied by GSA only as a reference. All procedures have been reviewed for general consistency with federal standards for rehabilitating historic buildings. Specifications should only be applied under the guidance of a qualified preservation professional who can assess the applicability of a procedure to a particular building, project or location.

References to products and suppliers serve as general guidelines and do not constitute a federal endorsement nor a determination that a product or method is the best alternative or compliant with current environmental regulations and safety standards.

Part 1 – General

1.01 Description

  1. This specification provides guidance for the restoration of terrazzo flooring.
    1. This specification has been developed for use on historic properties (defined as any district, site, building, structure, or object that is listed in or eligible for listing in the National Register of Historic Places) and provides an overview of accepted practices. Site-specific specifications, when appropriate, will be provided by the Architect.
    2. All work described herein and related work must conform to the Secretary of the Interior’s Standards for the Treatment of Historic Properties.
    3. The Contractor shall provide all labor, material, equipment, and operations required to complete the rehabilitation work indicated herein.
    4. All work described herein and related work must have the approval of a Cultural Resources Manager, Conservator, Historic Architect, or other professional who meets the standards outlined in the Secretary of the Interior’s Standards – Professional Qualifications Standards pursuant to 36 CFR.

1.02 Section includes

  1. Regrinding of terrazzo floors
  2. Preparation of surfaces for patching
  3. Repairs of delamination
  4. Crack repairs
  5. Placement of patching matrix
  6. Finish and curing of terrazzo

1.03 Section includes

  1. Section 013510 for general historic preservation project guidelines to be reviewed along with this procedure. These guidelines cover the following sections and should be reviewed prior to performing this procedure and should be followed, when applicable, along with recommendations from GSA Historic Preservation:
    1. Safety Precautions
    2. Historic Structures Precautions
    3. Submittals
    4. Quality Assurance
    5. Delivery, Storage and Handling
    6. Project/Site Conditions
    7. Sequencing and Scheduling
    8. General Protection (Surface and Surrounding)
    9. Historic Building Treatment Procedures

1.04 Quality assurance

  1. The Contractor performing the work described in this Section shall have a minimum of five years experience in terrazzo cleaning and restoration and shall have successfully completed at least three projects of similar scope within the previous five years. Installer shall be a contractor member of NTMA (National Terrazzo and Mosaic Association)  in good standing and shall perform all work in accordance with NTMA standards. He/she shall demonstrate a working knowledge of The Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring & Reconstructing Historic Buildings.

1.05 Submittals

  1. The Contractor shall submit to the Architect or GSA Approving Official:
    1. Identification of existing terrazzo system (epoxy, or cement) submitted in writing. All proposed methods and materials must be compatible with identified system.
    2. A detailed description and schedule of the areas to be treated, including an assessment of the problem surfaces, any necessary testing, and proposed general cleaning, polishing and repair techniques.
    3. A detailed description and schedule of areas for grinding.
    4. All cracks shall be identified as No Action (NA), Repair Crack (RC), or Replace Terrazzo (RT), in accordance with the standards set in this specification and with the GSA Historic Preservation. Crack classifications are to be reviewed and approved prior to the start of work.
    5. The manufacturer’s product literature for all proprietary products. If a custom formula is used, all ingredients must be documented and submitted for approval as with proprietary formulas. Product literature shall include specification data, Safety Data Sheets (SDS), and instructions for storage, handling, and use.
    6. Cleaning techniques should be submitted to GSA Historic Preservation for approval prior to implementation and mockups may be needed to protect adjacent historic surfaces.
    7. A project safety plan to include at minimum: any personal protective equipment to be used by the contractor’s staff such as disposable clothing, gloves and safety glasses, procedures for emergencies and accidents, documentation of staff training in use of equipment and/or chemical products as required by the manufacturers.
    8. Ongoing care and warranty requirements for all restored and newly installed materials.
    9. Provide a final report of completed work, including all approved submittals and photographs of the areas repaired that were taken before, during, and after the work.

1.06 Testing and mockups

  1. Contractor, at inconspicuous locations designated by the Project Team and GSA Historic Preservation, shall perform small test patches (no larger than 6 inches by 6 inches) for all products to be used. Testing will determine the best method(s) to perform the work and ensure that the chosen products do not cause harm. The “best method” shall be defined as that which successfully cleans and/or repairs the existing terrazzo with no, or minimal unavoidable damage to the existing terrazzo.
  2. Following testing, mockup panels shall be created (mockup panels may incorporate successful test patches) using the chosen methods. Size and location of mockup panels shall be determined by the project Team and GSA Historic Preservation.
  3. Each worker proposed for work on the project shall prepare a mockup panel of each activity they are to work on. Terrazzo workers whose mockups are not approved shall not be permitted to work on terrazzo repair and replacement.
  4. The methods used, their application, etc. shall be in accordance with manufacturer’s instructions and shall duplicate those procedures proposed for the terrazzo restoration work. GSA HIstoric Preservation shall conduct a thorough evaluation of each method after mockups are complete to determine the best method for the overall work.
  5. Mockups shall include an evaluation of the materials and techniques proposed for the protection of surrounding areas.
  6. For proprietary systems, a representative of the materials manufacturer(s) shall be present during the preparation and application of the test areas.
  7. Approved mockups shall become part of the work and shall serve as the quality standard for all similar work.
  8. Any testing, demonstrations, or mockup that is rejected by the project team shall be removed in its entirety without damage to the surrounding masonry and a new demonstration/mockup shall be performed for the project team’s review.
  9. Prepare the following mockups:
    1. Crack Repair: Prepare a sample area for each type of crack repair required (Hairline cracks 1/64” to 1/16” in size; cracks and voids larger than 1/8”). Repair shall demonstrate methods and quality of workmanship.
    2. Patching: Prepare on-floor, a sample of patching to include each type of repair required for the project. Patch shall demonstrate methods and quality of workmanship of patch repair.
    3. Cleaning including polishing.

1.07 Delivery, storage, and handling (as applied to products and materials)

  1. The Contractor shall:
    1. Deliver all materials and proprietary products to the project site in manufacturer’s or distributor’s packaging, undamaged, complete with application instructions and Safety Data Sheets (SDS).
    2. Transport, store, and use cleaning agents, chemicals, and solvents within the temperature range recommended by the manufacturer and away from direct sunlight. Handle all materials according to manufacturer’s instructions.
    3. Collect and dispose of waste material, packaging, debris, and effluent associated with the work in accordance with local, state, and federal environmental regulations.

1.08 Safety

  1. The contractor shall only use chemical products whose safety data sheets (SDS) have been reviewed and considered acceptable by the Government. Any project surfaces containing lead-based paint, as disclosed by the Government, shall be handled by the contractor in accordance with OSHA (29 CFR 1926.62), EPA (40 CFR 261) and State regulations. Any hazardous material that is removed in a project resulting from this scope shall undergo Toxicity Characteristic Leaching Procedure (TCLP) testing by the contractor. The contractor shall dispose of any lead waste as hazardous if it fails the TCLP.
  2. The Contractor shall survey the project area for ACMs. All thermal systems insulation (i.e. boiler insulation, duct insulation, pipe insulation), surfacing materials (i.e. plaster and sprayed-on fireproofing) and miscellaneous materials (i.e. asphalt flooring, ceiling tiles, adhesives and mastics, drywall, roofing, gaskets and cement board), installed no later than 1980, must be considered asbestos containing unless proven otherwise in accordance with 29 CFR 1926.1101. Work involving the disturbance, dismantling or demolition of asbestos containing materials or structures containing asbestos; or the removal and disposal of asbestos, shall also comply with the requirements of 40 CFR Part 61, Subparts A and M; 29 CFR 1910.1001 (where applicable); and GSA Specification 02085 Asbestos Abatement Procedures.
  3. The contractor shall isolate the work area with cones, tape or similar means as possible for the duration of the project, to prevent unauthorized individuals from entering the immediate work area.

1.09 Project/site conditions

  1. The work of this Section shall be executed when all areas of the terrazzo are at a temperature within the product manufacturer’s recommended temperature range for application. Do not install terrazzo when temperature is below 50℉ or above 90℉. Exterior work shall not commence when rain, snow, or below-freezing temperatures are expected within the next 24 hours. All surfaces shall be free of standing water, frost, and ice.
  2. The Contractor is responsible for protecting existing adjacent areas and materials during the execution of the work and shall provide all necessary protection and follow all necessary work procedures to avoid damage to existing material assemblies and vegetation not a part of the work of this Section.
  3. At a minimum, the Contractor shall:
    1. Protect all materials adjacent to terrazzo and work area.
    2. Exterior work areas should be accessed from the exterior only. Under no circumstances are hoses to be run or equipment transported through the building during exterior cleaning operations.
    3. Interior work areas should be closed off from foot traffic as coordinated with building management. Contractor shall erect containment and increase air flow as necessary. Protection of adjacent materials and construction crew path through the building must be in place prior to the start of work and inspected on an ongoing basis. Reference building treatment plan.
    4. If necessary, the Contractor shall erect waterproof enclosures around areas where treatment operations are in progress to protect nearby property and passers-by from overspray of chemicals or rinse water.
  4. If applicable, the Contractor shall coordinate treatment operations with the other trades involved in exterior and interior restoration work.
  5. All Contractor personnel performing treatment operations shall be provided by the Contractor with gloves, respirators, protective clothing and any other personal protective equipment (PPE) as recommended by the manufacturer of the products used during the work and required by local, state, and federal regulations.

Part 2 – Products

2.01 PRODUCTS

  1. Cleaner: Potable water, free of iron, and/or chemical cleaners, all cleaners must be pH neutral
  2. Sealer: Liquid type to completely seal matrix surface, compatible with terrazzo components
  3. Grout: Color to match existing matrix unless noted otherwise
  4. Matrix: Pigmented epoxy or cement to match approved sample
  5. Aggregates: Aggregates to match approved sample
  6. Divider Strips: Match width, material and color of divider strips, unless otherwise required
  7. Control Joint Strips: Use same material and color as divider strips, unless otherwise specified
  8. All work shall be executed with conventional terrazzo grinding equipment 

2.02 Equipment

  1. Hand sander, small grinding tools
  2. Grinding stones: Fine grit emery stones manufactured specifically for restorative type grinding and surfacing of terrazzo surfaces (#40 and #80 grit stones).
  3. Resurfacing Screens: A fine grit screen manufactured specifically for restorative type grinding and resurfacing terrazzo surfaces.
  4. Soft natural bristle brushes
  5. Circular buffing machine (for floors) with grinding and polishing screens as recommended by NTMA. Use conventional terrazzo grinding equipment rather than lighter type machines.
  6. Mop and bucket (non-metallic)
  7. Sponges
  8. Clean, dry cloths

Part 3 - Execution

3.01 General

  1. Standards
    1. Resurface terrazzo in accordance with NTMA specifications.
    2. Grind and polish the terrazzo floor as required to produce a clean, smooth, and uniform finish, capable of being sealed and polished to match existing. EXERCISE CAUTION WHEN GRINDING NEAR COATED DIVIDER STRIPS.
    3. Hairline cracks are classified as less than 1/32” (0.030) as per the National Terrazzo and Mosaic Association (NTMA) guidelines.
    4. Replacement (RT) shall be from architectural break to architectural break, and should be performed only if necessary.
  2. Resurfacing
    1. Grinding: Care should be taken to limit grinding and polishing to a small distance beyond the perimeter of the patch, until grout has been removed from the terrazzo surface. Avoid grinding divider strips.
      1. For small areas, sand surface with a hand sander or small grinding tool, using fine stones to achieve desired finish.
      2. For larger areas (such as floors), use a circular buffing machine with grinding and polishing pads as recommended by NTMA.
      3. Use a #24 or finer grit stone/screen (or as recommended by NTMA) for the initial grinding, exposing the marble chips. Fine mesh sand may be used if necessary. Follow with a fine #80 or finer grit stone/screen (or as recommended by NTMA).
    2. Rinse floor thoroughly with clean, clear water.
    3. Remove excess rinse water and machine or hand apply grout using identical Portland cement/acrylic or epoxy, color, and pigments as used in topping taking care to fill all voids completely.
    4. Cover grouted surface with paper or polyethylene for at least 72 hours.
    5. Final polish with a #80 or finer grit stone (or as recommended by NTMA), until grout has been removed from the terrazzo surface.
    6. Wash surface with neutral cleaner and thoroughly rinse with clean, clear water. Allow the surface to thoroughly dry.
    7. Seal terrazzo with a penetrating type sealer as recommended by manufacturer.
  3. Epoxy Repair Crack (RC)
    1. Crack shall be cleaned of all loose material, dirt and coatings.
      1. Remove all foreign matter from the void, followed by routing with a power tool.
      2. Remove all sealer from the surface adjacent to the void with a stripper or ammonia.
    2. Crack shall be filled with resin to match existing color, texture, and hardness.
      1. Resin shall be standard 2-component epoxy resin, designed specifically for patching of terrazzo materials or approved alternative.
        1. Blend the resin materials to match the color matrix, by adding marble dust or pigment to match color of existing terrazzo matrix.
        2. Force mixed resin into the void, making sure it is pressured into the crack as deep as possible. In some cases, the supplier will instruct using a primer for their materials.
    3. If crack is wider than ¼” aggregate shall be used. Aggregate for epoxy shall be natural, sound, crushed marble chips without excessive flats or flakes, complying with NTMA requirements.
      1. Aggregate shall match existing in color and gradation of sizes. Chosen aggregate shall be submitted to GSA Historic Preservation for approval prior to mockup.
      2. Aggregate colors should be matched after cleaning or taken from the interior of core samples depending upon scope of work.
  4. Cement Repair Crack (RC)
    1. If the binder of the existing terrazzo floor is Portland cement-based,  fine-line cracks or chips can be repaired using a cement grout. This is a more labor intensive repair than epoxy, but is usually more durable in comparison.
      1. Use a cement grout of approved color with approved aggregate mixture/blend, to match existing terrazzo matrix.
      2. Mix the grout into a thick paste and carefully work it into the cracked portion with the use of a putty knife.
      3. Once the grout is in place, a terrazzo mixture of marble chips and cement grout should be applied over the first layer of grout before it has dried.  Once the second layer is applied, level the area with a trowel.
      4. Once the mixture is leveled and dried, the area should be sanded down with a 40-grit sandpaper to be followed up with a finer grit, like the 80-grit sandpaper to further smoothen the repaired patch.
      5. After sanding the patch, seal the area with a clear penetrating sealer.  Note that the pH should be between 7 and 10.
  5. Replace Terrazzo (RT)
    1. Areas deemed necessary for removal are to be removed carefully to prevent damage to surrounding existing terrazzo not scheduled for repair.
    2. Clean area and prepare for new terrazzo, using a mix that matches the existing in texture, color, and matrix (epoxy or cement).
    3. Repair substrate as needed. Fill cracks with hardening epoxy or, for epoxy systems only, use mesh isolation membrane to cover crack with liquid membrane.
    4. Place divider strips prior to pouring terrazzo topping.
    5. Fill area with epoxy or cement /cement matrix and approved aggregate mixture/blend.
    6. If repair is not to architectural break or existing terrazzo divider strip, the joining edge shall be a saw tooth (jagged edge). Intent is to disguise the line so it will blend into the rest of the terrazzo floor, irregularly place marble chips matching the existing terrazzo blend along the line, approximately one to two inches on center, while the patching resin is still in a wet state. Finally, tool off surface and allow to cure.
  6. Replace Divider Strips, as needed
    1. Existing divider strips should be retained if possible. If replacement is necessary, due to missing or damaged divider strips, divider strips should be of solid composition and match existing in size, color, sheen and metal (brass, zinc, aluminum.). Do not use coated divider strips, unless specified.
    2. Install divider and control joint strips straight and level to locations indicated.
  7. Control Joint Strips:
    1. Double or split units, 1/8” wide, of same material and color as divider strips with 1/8” wide full-depth filler, laminated between strips.
    2. Install base and border divider and control joint strips to match existing floor pattern.

3.02 Initial grinding

  1. Areas for grinding of existing terrazzo should be agreed upon by the project team and carefully marked. For newly poured terrazzo, care should be taken to limit grinding and polishing to a small distance beyond the perimeter of the patch, until grout has been removed from the terrazzo surface. Avoid grinding divider strips.
  2. When the material has hardened, sand surface with a hand sander or small grinding tool, using fine stones.
  3. Wet or dry grind with appropriate medium diamonds/Stones as approved from mockup.
  4. Grind with 24 or finer grit stone — fine mesh sand can be used if needed — all in the presence of water.
  5. Follow initial grind with 80 or finer grit stones in the presence of water, but omit sand. 

3.03 Grouting

  1. Cleanse floor with clean water and rinse. Wet grind with 50 or higher abrasive grit medium diamonds.
  2. Remove excess water and machine or hand grout with cement/acrylic or epoxy material, with or without color added to match the matrix of the existing Terrazzo floor, to fill as needed. Make sure to fill all voids.

3.04 Curing grout

  1. Allow grout to cure a minimum of 72 hours. Maintain ambient air temperature between 70°F (21°C) and 80°F (27°C). If necessary, Cover grouted surface with paper or polyethylene for at least 72 hours. 

3.05 Fine (final) grinding

  1. Final polish with a #80 or finer grit stone. Care should be taken to limit grinding and polishing to a small distance beyond the perimeter of the patch, until grout has been removed from the terrazzo surface. Avoid grinding divider strips.

3.06 Cleaning and sealing

  1. Wash all surfaces with a neutral cleaner, rinse with clean water and allow to dry fully.
  2. Seal: Apply sealer per sealer manufacturer’s written directions. Interior floor sealer shall be odorless, slip and stain resistant penetrating sealer with pH factor between 7 and 10, that does not affect color or physical properties of terrazzo surface.
  3. Remove protection and clean any adjacent surfaces affected by the refinishing process. If more than a wipe down is needed or material is adhered to adjacent surface, contact GSA Historic Preservation for recommendations on appropriate cleaning techniques. Cleaning techniques should be submitted to GSA Historic Preservation for approval prior to implementation and mockups may be needed to protect adjacent historic surfaces.

3.07 Protection

  1. If necessary, Contractor shall protect the finished floor from all site activity until Substantial Completion.

Part 4 – Final report

4.01 Final report

  1. The Contractor Shall:
    1. Provide a final report of completed work, including all approved submittals and photographs of the areas repaired that were taken before, during, and after the work.
    2. Provide a written summary of the project and results upon final inspection and approval. The summary shall include a discussion of steps taken or new findings not specified in the initial documentation. Summary should also include any applicable ongoing care and warranty requirements.

Technical Procedures Disclaimer
Prior to inclusion in GSA’s library of procedures, documents are reviewed by one or more qualified preservation specialists for general consistency with the Secretary of Interior Standards for rehabilitating historic buildings as understood at the time the procedure is added to the library. All specifications require project-specific editing and professional judgement regarding the applicability of a procedure to a particular building, project or location. References to products and suppliers are to serve as a general guideline and do not constitute a federal endorsement or determination that a product or method is the best or most current alternative, remains available, or is compliant with current environmental regulations and safety standards. The library of procedures is intended to serve as a resource, not a substitute, for specification development by a qualified preservation professional.

Rewrite
We’ve reviewed these procedures for general consistency with federal standards for rehabilitating historic buildings and provide them only as a reference. Specifications should only be applied under the guidance of a qualified preservation professional who can assess the applicability of a procedure to a particular building, project or location. References to products and suppliers serve as general guidelines and do not constitute a federal endorsement nor a determination that a product or method is the best alternative or compliant with current environmental regulations and safety standards.

Print Page Email Page
Last updated: Aug 31, 2026
Top

Home

  • Resources for …
    • Americans with Disabilities
    • Citizens and Consumers
    • Federal Employees
    • GSA Employees
    • Native American affairs
    • Presidential & Congressional Commissions, Boards or Small Agencies
    • Small Business
  • Governmentwide Initiatives
    • Centers of Excellence
    • Digital experience
    • Emergency response
    • Federal Cybersecurity
    • ID, Credentials, and Access Management
    • Information Quality
    • Open Data
    • Technology Modernization Fund
  • Contact us
    • Report a website issue
  • Organization
    • Leadership Directory
    • Staff Directory
  • References
    • Annual reports
    • Budget and Performance
    • Orders & Directives
    • Forms
  • Website Information
    • A-Z Index
    • Sitemap
  • Also of Interest
    • Data.gov
    • Whitehouse.gov
  • Tools
    • eBuy
    • eLibrary
    • Contracting forecast tool
    • GSA Advantage
    • GSA Auctions
GSA logo
  • Facebook
  • X
  • LinkedIn
  • Truth Social
  • YouTube
  • instagram
  • Blog
  • email

JOIN THE CONVERSATION

GSA.gov

An official website of the U.S. General Services Administration

  • Accessibility statement
  • Website Policies
  • Reports
  • Office of the Inspector General
  • No FEAR Act
  • FOIA Requests
  • Board of Contract Appeals
Looking for U.S. government information and services?
Visit USA.gov

PER DIEM LOOK-UP

1 Choose a location

Error, The Per Diem API is not responding. Please try again later.

No results could be found for the location you've entered.

Get my location

OR

OR

Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.

Rates for foreign countries are set by the Department of State.

2 Choose a date


OR

Rates are available between 10/1/2023 and 09/30/2026.

The End Date of your trip can not occur before the Start Date.

 
 
Additional terms and conditions

Traveler reimbursement is based on the location of the work activities and not the accommodations, unless lodging is not available at the work activity, then the agency may authorize the rate where lodging is obtained.

Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely surrounded by, the corporate limits of the key city, including independent entities located within those boundaries."

Per diem localities with county definitions shall include"all locations within, or entirely surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties, including independent entities located within the boundaries of the key city and the listed counties (unless otherwise listed separately)."

When a military installation or Government - related facility(whether or not specifically named) is located partially within more than one city or county boundary, the applicable per diem rate for the entire installation or facility is the higher of the rates which apply to the cities and / or counties, even though part(s) of such activities may be located outside the defined per diem locality.