Skip to main content

An official website of the United States government

Here’s how you know

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( Lock A locked padlock ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

GSA 250 year anniversary logo and seal U.S. General Services Administration
    • Explore buy through us
    • Category management
    • Government property for sale or lease
      Toggle submenu
      • Personal property (tangible goods)
      • Vehicle sales
    • Products and services
      Toggle submenu
      • Human capital
      • Industrial products and services
      • Office management
      • Professional services
      • Security and protection
      • Transportation and logistics services
    • Purchasing programs
      Toggle submenu
      • Assisted acquisition
      • Commercial platforms
      • Emergency acquisition basic ordering agreements
      • Federal strategic sourcing initiative
      • Fleet management
      • Governmentwide acquisition contracts
      • HCaTS and HCaTS SB
      • Multiple award schedule, or MAS
      • OASIS and OASIS SB
      • OneGov
      • Requisition programs
    • Shared services
      Toggle submenu
      • Payroll services
      • Support services for CABs

    Featured Topics

    • Auctions Federal assets available via auction to the general public.
    • Explore sell to government
    • Step 1: Learn about government contracting
      Toggle submenu
      • Ways you can sell to government
      • How to access contract opportunities
      • Conduct market research
    • Step 2: Compete for a contract
      Toggle submenu
      • Register your business
      • Certify as a small business
      • Become a schedule holder
      • Market your business
      • Research active solicitations
      • Respond to a solicitation
      • What to expect during the award process
    • Step 3: Manage your contract
      Toggle submenu
      • Comply with contractual requirements
      • Handle contract modifications
      • Monitor past performance evaluations

    Featured Topics

    • Contract opportunities on SAM.gov Search current federal contract opportunities and procurement notices.
    • Forecast of contracting opportunities Anticipated contracts offered by GSA.
    • Vendor support center Research the federal market, report sales, and upload contract information.
    • Explore real estate
    • Assets identified for accelerated disposition
    • Child care services
      Toggle submenu
      • Find a child care center
    • Leasing
      Toggle submenu
      • Leasing guidance
      • Leasing tools
    • Occupancy Agreement Space Inventory System, or OASIS
    • Portfolio and occupancy space planning
    • Reimburseable services program
      Toggle submenu
      • eRETA RWA customer portal
      • eRETA user account request process
    • Water quality management
    • Workplace optimization
      Toggle submenu
      • Commercial coworking
      • Offerings
    • USE IT Act and occupancy data
      Toggle submenu
      • Playbook: Federal daily check-in survey
      • Playbook: Laptop occupancy data
    • Utility services

    Featured Topics - Real Estate

    • Real property disposal Dispose or acquire excess federal real property including buildings or land.
    • Explore policy and regulations
    • Acquisition policy
    • Aviation management policy
    • Federal Advisory Committee Act management
    • Information technology policy
    • Real property management policy
    • Travel management policy
    • Regulations
      Toggle submenu
      • Federal acquisition regulations
      • Federal management regulations
      • Federal travel regulations

    Featured Topics

    • Forms Search for a government form.
    • Per diem FAQs Frequently asked questions about per diem rates and related topics.
    • USE IT and occupancy data annual reports Search the annual reports CFO Act agencies submitted for USE IT occupancy data requirements.
    • Explore small business
    • Find opportunities
    • Get help
    • How to do business with us
    • Key resources
    • Programs and eligibility
    • Register your business

    Featured Topics

    • Forecast tool Information on planned federal contracting opportunities.
    • Socio economic categories Check your eligibility for small-business set-asides.
    • Training resources Suggested training for doing business with us.
    • Explore travel
    • Plan a trip
      Toggle submenu
      • Per diem rates
      • Transportation (airfare rates, POV rates, etc.)
      • Lodging
      • Travel charge card
    • Travel and lodging services
      Toggle submenu
      • E-gov travel service (ETS)
      • Rideshare
      • Travel category schedule
    • Federal travel regulation

    Featured Topics

    • Per diem rates look-up Allowances for lodging, meal and incidental costs while on official government travel.
    • Mileage reimbursement rates Reimbursement rates for the use of your own vehicle while on official government travel.
    • Explore technology
    • Purchasing programs
      Toggle submenu
      • Cloud computing services
      • Cybersecurity products and services
      • Governmentwide acquisition contracts
      • MAS information technology
      • USAccess
    • Government initiatives
      Toggle submenu
      • Artificial Intelligence
      • Cybersecurity
      • Emerging citizen technology
      • FedRAMP
      • Federal identity, credentials, and access management
      • Robotic process automation community
      • Technology modernization fund

    Featured Topics

    • Data.gov Access U.S. government data.
    • Multiple award schedule IT category Information technology products, services and solutions.
    • Explore About GSA
    • Background and history
      Toggle submenu
      • Overview
      • Mission and strategic goals
      • Role in presidential transitions
    • Careers
      Toggle submenu
      • Discover special hiring paths
      • Elevate your professional career
      • Get an internship
      • Launch your career
      • Resources and related links
    • Contact us
      Toggle submenu
      • Request a speaker
    • Events and training
    • Leadership directory
      Toggle submenu
      • Federal Acquisition Service
      • Public Buildings Service
      • Staff offices
    • Newsroom
      Toggle submenu
      • Agency blog
      • Congressional testimony
      • News releases
      • Speeches
      • Videos

    Featured Topics

    • Blog Read the latest GSA news, updates and analysis.
    • Careers Learn what we have to offer.
  • Per diem lookup
Buy through us
Explore buy through us
Category management
Government property for sale or lease
Personal property (tangible goods)
Vehicle sales
Products and services
Human capital
Industrial products and services
Office management
Professional services
Security and protection
Transportation and logistics services
Purchasing programs
Assisted acquisition
Commercial platforms
Emergency acquisition basic ordering agreements
Federal strategic sourcing initiative
Fleet management
Governmentwide acquisition contracts
HCaTS and HCaTS SB
Multiple award schedule, or MAS
OASIS and OASIS SB
OneGov
Requisition programs
Shared services
Payroll services
Support services for CABs
Sell to government
Explore sell to government
Step 1: Learn about government contracting
Ways you can sell to government
How to access contract opportunities
Conduct market research
Step 2: Compete for a contract
Register your business
Certify as a small business
Become a schedule holder
Market your business
Research active solicitations
Respond to a solicitation
What to expect during the award process
Step 3: Manage your contract
Comply with contractual requirements
Handle contract modifications
Monitor past performance evaluations
Real estate
Explore real estate
Assets identified for accelerated disposition
Child care services
Find a child care center
Leasing
Leasing guidance
Leasing tools
Occupancy Agreement Space Inventory System, or OASIS
Portfolio and occupancy space planning
Reimburseable services program
eRETA RWA customer portal
eRETA user account request process
Water quality management
Workplace optimization
Commercial coworking
Offerings
USE IT Act and occupancy data
Playbook: Federal daily check-in survey
Playbook: Laptop occupancy data
Utility services
Policy and regulations
Explore policy and regulations
Acquisition policy
Aviation management policy
Federal Advisory Committee Act management
Information technology policy
Real property management policy
Travel management policy
Regulations
Federal acquisition regulations
Federal management regulations
Federal travel regulations
Small business
Explore small business
Find opportunities
Get help
How to do business with us
Key resources
Programs and eligibility
Register your business
Travel
Explore travel
Plan a trip
Per diem rates
Transportation (airfare rates, POV rates, etc.)
Lodging
Travel charge card
Travel and lodging services
E-gov travel service (ETS)
Rideshare
Travel category schedule
Federal travel regulation
Technology
Explore technology
Purchasing programs
Cloud computing services
Cybersecurity products and services
Governmentwide acquisition contracts
MAS information technology
USAccess
Government initiatives
Artificial Intelligence
Cybersecurity
Emerging citizen technology
FedRAMP
Federal identity, credentials, and access management
Robotic process automation community
Technology modernization fund
About GSA
Explore About GSA
Background and history
Overview
Mission and strategic goals
Role in presidential transitions
Careers
Discover special hiring paths
Elevate your professional career
Get an internship
Launch your career
Resources and related links
Contact us
Request a speaker
Events and training
Leadership directory
Federal Acquisition Service
Public Buildings Service
Staff offices
Newsroom
Agency blog
Congressional testimony
News releases
Speeches
Videos
  1. Home
  2. Real estate
  3. Technical Procedures
  4. Cleaning and Finishing Bronze Architectural Elements

Cleaning and Finishing Bronze Architectural Elements

CSI Division: Division 5 - Metals
Specification ID:  HP050110
Materials: Metals
Last Modified: 02/27/2026

 Disclaimer

Technical procedures are supplied by GSA only as a reference. All procedures have been reviewed for general consistency with federal standards for rehabilitating historic buildings. Specifications should only be applied under the guidance of a qualified preservation professional who can assess the applicability of a procedure to a particular building, project or location.

References to products and suppliers serve as general guidelines and do not constitute a federal endorsement nor a determination that a product or method is the best alternative or compliant with current environmental regulations and safety standards.

Part 1 – General

1.01 Description

  1. This specification provides guidance for cleaning and applying protective coatings to bronze architectural elements.
    1. This specification has been developed for use on historic properties (defined as any district, site, building, structure, or object that is listed in or eligible for listing in the National Register of Historic Places) and provides an overview of accepted practices. Site-specific specifications, when appropriate, will be provided by the Architect.
    2. All work described herein and related work must conform to the Secretary of the Interior’s Standards for the Treatment of Historic Properties.
    3. The Contractor shall provide all labor, material, equipment, and operations required to complete the rehabilitation work indicated herein.
    4. All work described herein and related work must have the approval of a Cultural Resources Manager, Conservator, Historic Architect, or other professional who meets the standards outlined in the Secretary of the Interior’s Standards – Professional Qualifications Standards pursuant to 36 CFR.

1.02 Section includes

  1. General cleaning of bronze
  2. Removal of deteriorated lacquer from bronze
  3. Application of a new clear coating to bronze
  4. Touch up of damaged clear coating
  5. Application of wax

1.03 Related sections

  1. Section 01100-07-S for general project guidelines to be reviewed along with this procedure. These guidelines cover the following sections and should be reviewed prior to performing this procedure and should be followed, when applicable, along with recommendations from GSA Historic Preservation:
    1. Safety Precautions
    2. Historic Structures Precautions
    3. Submittals
    4. Quality Assurance
    5. Delivery, Storage and Handling
    6. Project/Site Conditions
    7. Sequencing and Scheduling
    8. General Protection (Surface and Surrounding)
    9. Historic Building Treatment Procedures

1.04 Quality assurance

  1. The Contractor performing the work described in this Section shall have a minimum of 5 years experience in bronze cleaning and restoration and shall have successfully completed at least 3 projects of similar scope within the previous 5 years. Contractor shall demonstrate a working knowledge of The Secretary of the Interior’s Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring & Reconstructing Historic Buildings.

1.05 Submittals

  1. The Contractor shall submit to the Architect or GSA Approving Official:
    1. A detailed description and schedule of the areas to be treated, including an assessment of the problem surfaces, any necessary testing, and proposed general cleaning techniques, lacquer removal procedures, clear coating application methods, waxing procedures, etc., for approval once cleaning test panels are completed and approved.
    2. The manufacturer’s product literature for all proprietary products. If a custom wax formula is used, all ingredients must be documented and submitted for approval as with proprietary formulas. Product literature shall include specification data, Safety Data Sheets (SDS), and instructions for storage, handling, and use.
    3. A project safety plan to include at minimum: any personal protective equipment to be used by the contractor’s staff such as disposable clothing, gloves and safety glasses, procedures for emergencies and accidents, documentation of staff training in use of equipment and/or chemical products as required by the manufacturers.
    4. Ongoing care and warranty requirements for all restored and newly installed materials.
    5. Provide a final report of completed work, including all approved submittals and photographs of the areas repaired that were taken before, during, and after the work.

1.06 Testing and mockups

  1. Contractor, at inconspicuous locations designated by the Project Team and GSA HP, shall perform small test patches (no larger than 6 inches by 6 inches) for all products to be used. Testing will determine the best method(s) to perform the work and ensure that the chosen products do not cause harm.
  2. Following testing, mockup panels shall be created (mockup panels may incorporate successful test patches) using the chosen methods. Size and location of mockup panels shall be determined by the project Team and GSA HP.
  3. testing and mockups shall include (as applicable), but not be limited to:
    1. General cleaning
    2. Lacquer and/or wax removal
    3. Finish coat methods
    4. Wax application procedures
  4. The methods used, their application, etc. shall be in accordance with manufacturer’s instructions and shall duplicate those procedures proposed for the overall bronze cleaning and protective coating process. GSA HP shall conduct a thorough evaluation of each method after work is complete to determine the best method for the overall work.
  5. The mockup shall include an evaluation of the materials and techniques proposed for the protection of surrounding areas from the chemicals used to clean and coat the bronze, and must include an evaluation of the method to be used to collect the cleaning effluent.
  6. For proprietary cleaning systems, a representative of the cleaning materials manufacturer(s) shall be present during the preparation and application of the test areas.
  7. Each worker proposed for work on the project shall prepare a mockup panel of each activity they are to work on. Workers whose mockups are not approved shall not be permitted to work on the project.
  8. Approved mockup panels shall become part of the work and shall serve as the quality standard for all similar work.
  9. Any testing, demonstration, or mockup that is rejected by the architect shall be removed in its entirety without damage to the surrounding masonry and a new demonstration/mockup shall be performed for the architect’s review.

1.07 Delivery, storage, and handling (as applied to products and materials)

  1. The Contractor shall:
    1. Deliver restoration cleaning and testing materials and proprietary products to the project site in manufacturer’s or distributor’s packaging, undamaged, complete with application instructions and Safety Data Sheets (SDS)
    2. Transport and store cleaning agents, chemicals, and solvents within the temperature range recommended by the manufacturer and away from direct sunlight. Handle all materials according to manufacturer’s instructions.
    3. Collect and dispose of waste material, packaging, debris, and effluent associated with the work in accordance with local, state, and federal environmental regulations.

1.08 Safety

  1. The contractor shall only use chemical products whose safety data sheets (SDS) have been reviewed and considered acceptable by the Government. Any project surfaces containing lead-based paint, as disclosed by the Government, shall be handled by the contractor in accordance with OSHA (29 CFR 1926.62), EPA (40 CFR 261) and State regulations. Any lead-based paint or coating that is removed in a project resulting from this scope shall undergo Toxicity Characteristic Leaching Procedure (TCLP) testing by the contractor. The contractor shall dispose of any lead-paint waste as hazardous if it fails the TCLP.
  2. Any paint or coating required to be removed which has not been disclosed by the Government to contain lead, shall be tested for lead by the contractor. All paints or coatings testing positive shall be handled and disposed of as lead-based.
  3. The contractor shall isolate the work area with cones, tape or similar means as possible for the duration of the project, to prevent unauthorized individuals from entering the immediate work area.
  4. For any work required on elevated surfaces (4 feet or more above the ground) the contractor shall install and use any ladders, scaffolding or platforms in accordance with OSHA regulations (29 CFR Subpart M).

1.09 Project/site conditions

  1. The work of this Section shall be executed when all areas of the bronze are at a temperature within the product manufacturer’s recommended temperature range for application. Exterior work shall not commence when rain, snow, or below-freezing temperatures are expected within the next 24 hours. All surfaces shall be free of standing water, frost, and ice.
  2. The Contractor is responsible for protecting existing adjacent areas and materials during the execution of the work and shall provide all necessary protection and follow all necessary work procedures to avoid damage to existing material assemblies and vegetation not a part of the work of this Section.
  3. At a minimum, the Contractor shall:
    1. Protect woodwork, glass, metal, and any material adjacent to bronze areas to be cleaned from overspray and possible chemical or water damage from cleaning operations. Cover all window openings with waterproof plastic to prevent leakage to the building interior.
    2. Protect surrounding vegetation from runoff during cleaning operations.
    3. Exterior work areas should be accessed from the exterior only. Under no circumstances are hoses to be run or equipment transported through the building during exterior cleaning operations.
    4. If necessary, the Contractor shall erect waterproof enclosures around areas where treatment operations are in progress to protect nearby property and passers-by from overspray of chemicals or rinse water.
  4. If applicable, the Contractor shall coordinate treatment operations with the other trades involved in exterior and interior restoration work, including but not limited to masonry restoration, sealing, and painting. Masonry cleaning is to be completed prior to restoration of windows, doors, and metalwork, and prior to any exterior painting in the affected areas.
  5. All Contractor personnel performing treatment operations shall be provided by the Contractor with gloves, respirators, protective clothing and any other personal protective equipment (PPE) as recommended by the manufacturer of the products used during the work and required by local, state, and federal regulations.
  6. The Contractor shall complete installation of temporary seals and protection at window and door perimeters prior to starting cleaning operations where required to prevent leakage to the interior.

PART 2 – Products

2.01 Products

  1. Lacquer: UV Resistant, long lasting lacquer coating
  2. Wax: conservation-grade outdoor sculpture wax and Clear Paste Wax
  3. 3-5% solution of non-ionic detergent
  4. Conservation grade metal de-corroder
  5. Pure acetone
  6. Patina (mineral patinas, Dye‐Oxide Patinas…)

2.02 Materials

  1. Soft, lint-free polyester-blended cotton cloth
  2. Soft natural bristle buffing brush
  3. Duct-tape
  4. Bamboo skewers

2.03 Cleaning of bronze

  1. Investigation and methods selection
    1. Identification of substrate conditions, previous treatments, and any existing coatings. Testing may require additional technical expertise from a materials scientist, architectural conservator, microbiologist, and/or other technical expert. The Contractor shall choose the gentlest method possible to clean the bronze and remove any existing coatings without damaging the substrate.
    2. The Contractor shall conduct cleaning, coating removal, and protective coating application test patches, in unobtrusive locations on the surface to be cleaned. The purpose of the test patch is to determine the gentlest, most effective method to clean, strip and apply protective coatings to  the bronze. Several cleaning, stripping and coating methods are preferably tested side by side in small patches, size and location to be determined by GSA HP and the project team.
    3. Damage to the bronze, including its patina, cannot be addressed by cleaning, and is therefore not covered under this section.
    4. Existing conditions and processes must be documented before, during, and after work.
  2. Cleaning methods:
    1. Brush away all dirt and debris with dry, clean, soft bristle brushes. Wrap metal ferrules of brushes with duct tape to avoid scratching the bronze. Use small natural bristle brushes and bamboo skewers to dislodge debris from crevices. Metal tools shall not be used.
    2. If the bronze is adjacent to surfaces of a different material, flood that material with clean water or protect it carefully if water is not appropriate, to prevent absorption of cleaning effluent.
    3. Rinse sculpture with potable water delivered from a garden hose or pump sprayer.
    4. After rinsing, clean the bronze with a 3-5% solution of non-ionic detergent in water. Apply with soft natural bristle brushes and rinse repeatedly with water until all cleaning residue is removed from the surface. Surface corrosion may be reduced by lightly buffing with a pre-wetted soft scrubbing pad for sensitive surfaces and cotton cloths, then rinsed. Areas of stubborn corrosion may be treated with a conservation grade metal de-corroder. During corrosion removal, the bronze patina shall not be disturbed. Clean, absorbent cotton cloths will be used to thoroughly dry the bronze.
    5. Blasting, such as pulverized walnut shell and CO2, may be used to clean the bronze without removing patina. When needed, a corrosion inhibitor may be applied following the blasting, prior to the application of a wax coating.
    6. To remove extensive mineral scale: Medium to high (1000 psi to 2800 psi) pressure washing methods may be utilized during washing to aid in the removal of mineral scale deposits, reduce corrosion, and remove any found surface accretions. Always start at the lowest psi and check for damage. To safeguard against over cleaning, the washer wand will be equipped with a minimum 25‐degree fan tip nozzle and positioned with a minimum 12‐inch standoff distance from the bronze object. Where required, mineral scale may be softened prior to washing with a mild acetic acid poultice, or the like, to ease mineral scale removal during washing efforts.
    7. Remove existing lacquer only if necessary, using pure acetone, applied with a cotton cloth wiped along the grain of the metal. Allow the acetone to stand on the metal for several minutes and then wipe it away with a cotton cloth followed by a water rinse. Several applications of the solvent may be necessary in order to remove all traces of the lacquer from the metal.
    8. Depending on testing results of existing finishes, cleaning may also include partial or whole stripping of existing finishes with an environmentally friendly stripper. This step will ensure proper surface preparation for the new coatings.
    9. Provide an additional cleaning with a 5% solution of non-ionic detergent in water as noted above to remove residues from corrosion removal and stripper application.
  3. Patina Touch-up (only perform if deemed necessary)
    1. Patina may be touched up in areas of bare metal to match the characteristics of the existing patina. The patina formulation will be customized for this purpose, but should include traditional mineral patinas, Dye‐Oxide Patinas, and patinas as found in existing documentation of the piece(s) or determined through testing. 

2.04 Application of clear coat

  1. Lacquer - new coat
    1. Where lacquer coatings are required, the use of a UV Resistant, long lasting lacquer coating is recommended. Clear coating is to be applied to dry surface within 4 hours of cleaning and according to the manufacturer’s instructions. It is not to be applied in inclement weather or when the relative humidity exceeds 60%. The clear coating should be sprayed on using conventional spray equipment.
    2. Remove any dust that may have deposited on the surface after cleaning with a soft lint-free cloth.
    3. Apply each coat in a thin mist. Allow to dry a minimum of 30 minutes between coats. Number of coats (generally between 5-8)will depend on the environmental conditions to which the object is exposed.
    4. Minimum thickness of full coating shall be 1 millimeter.
    5. If the lacquer is too glossy, a polyethylene dispersion can be added to the final coat of lacquer to bring down the sheen.
    6. Final drying time will be 24-48 hours before the bronze can be touched or used. Dry time will vary depending on humidity levels.
  2. Lacquer - Touch up
    1. Spot repair areas of lacquer coatings that have been damaged or are missing.
    2. If a protective wax coating is present, remove with appropriate solvent.
    3. Clean surface to be repaired with a soft cloth, water and appropriate mild detergent. Use cloth dipped in cleaning solution to wipe the area of repair, do not wet the entire surface. Rinse area with water and allow to dry completely.
    4. Clear coating is to be applied to dry surface within 4 hours of cleaning and according to the manufacturer’s instructions. It is not to be applied in inclement weather or when the relative humidity exceeds 60%. Lacquer should be spray applied to achieve uniform coverage. Size of sprayer should be chosen based on size of area to be covered with lacquer.
    5. Apply each coat in a thin mist. Allow to dry a minimum of 30 minutes between coats. Number of coats (generally between 5-8)will depend on the environmental conditions to which the object is exposed.
    6. Minimum thickness of full coating shall be 1 millimeter and shall match the surrounding surfaces.
    7. Final drying time will be 24-48 hours before the bronze can be touched or used. Dry time will vary depending on humidity levels.
  3. Wax
    1. Hot Wax (not for use with lacquer coatings).
      1. Bronze shall be cleaned as detailed above.
      2. Protection must be used to protect surrounding materials from wax and from application procedures and equipment.
      3. A thin coat of a conservation-grade outdoor sculpture wax shall be applied to the bronze. The wax chosen shall be formulated with consideration given to the bronze object’s location and environmental conditions and the weather during the period of application. Hot wax shall be applied by mildly heating surfaces with a propane torch while preventing disturbance or discoloration of the underlying bronze and patina. Soft bristle brushes with wrapped ferrules shall be used for application. After the wax has set, it shall be buffed with natural bristle brushes and clean, lint-free polyester-blended cotton cloths. If necessary for added protection, a second coat of hot wax shall be applied and buffed as described above. Two coats of hot wax are recommended for enhanced protection if the bronze frequently gets wet or is subject to de-icing salts.
      4. One coat of approved Clear Paste Wax will be applied at ambient temperature to the bronze, allowed to set, and buffed as described above to a lustrous finish.
    2. Cold Wax
      1. One coat of approved Clear Paste Wax will be applied at ambient temperature to the bronze, allowed to set, and buffed to a lustrous finish with soft natural bristle buffing brushes and soft lint-free cloths. Two coats of cold wax are recommended for enhanced protection if the bronze frequently gets wet or is subject to de-icing salts. 

2.05 Final report

  1. The Contractor Shall:
    1. Provide a final report of completed work, including all approved submittals and photographs of the areas cleaned that were taken before, during, and after the work.
    2. Provide a written summary of the project and results upon final inspection and approval. The summary shall include a discussion of steps taken or new findings not specified in the initial documentation. Summary should also include any applicable ongoing care and warranty requirements.

Technical Procedures Disclaimer
Prior to inclusion in GSA’s library of procedures, documents are reviewed by one or more qualified preservation specialists for general consistency with the Secretary of Interior Standards for rehabilitating historic buildings as understood at the time the procedure is added to the library. All specifications require project-specific editing and professional judgement regarding the applicability of a procedure to a particular building, project or location. References to products and suppliers are to serve as a general guideline and do not constitute a federal endorsement or determination that a product or method is the best or most current alternative, remains available, or is compliant with current environmental regulations and safety standards. The library of procedures is intended to serve as a resource, not a substitute, for specification development by a qualified preservation professional.

Rewrite
We’ve reviewed these procedures for general consistency with federal standards for rehabilitating historic buildings and provide them only as a reference. Specifications should only be applied under the guidance of a qualified preservation professional who can assess the applicability of a procedure to a particular building, project or location. References to products and suppliers serve as general guidelines and do not constitute a federal endorsement nor a determination that a product or method is the best alternative or compliant with current environmental regulations and safety standards.

Print Page Email Page
Last updated: Aug 31, 2026
Top

Home

  • Resources for …
    • Americans with Disabilities
    • Citizens and Consumers
    • Federal Employees
    • GSA Employees
    • Native American affairs
    • Presidential & Congressional Commissions, Boards or Small Agencies
    • Small Business
  • Governmentwide Initiatives
    • Centers of Excellence
    • Digital experience
    • Emergency response
    • Federal Cybersecurity
    • ID, Credentials, and Access Management
    • Information Quality
    • Open Data
    • Technology Modernization Fund
  • Contact us
    • Report a website issue
  • Organization
    • Leadership Directory
    • Staff Directory
  • References
    • Annual reports
    • Budget and Performance
    • Orders & Directives
    • Forms
  • Website Information
    • A-Z Index
    • Sitemap
  • Also of Interest
    • Data.gov
    • Whitehouse.gov
  • Tools
    • eBuy
    • eLibrary
    • Contracting forecast tool
    • GSA Advantage
    • GSA Auctions
GSA logo
  • Facebook
  • X
  • LinkedIn
  • Truth Social
  • YouTube
  • instagram
  • Blog
  • email

JOIN THE CONVERSATION

GSA.gov

An official website of the U.S. General Services Administration

  • Accessibility statement
  • Website Policies
  • Reports
  • Office of the Inspector General
  • No FEAR Act
  • FOIA Requests
  • Board of Contract Appeals
Looking for U.S. government information and services?
Visit USA.gov

PER DIEM LOOK-UP

1 Choose a location

Error, The Per Diem API is not responding. Please try again later.

No results could be found for the location you've entered.

Get my location

OR

OR

Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.

Rates for foreign countries are set by the Department of State.

2 Choose a date


OR

Rates are available between 10/1/2023 and 09/30/2026.

The End Date of your trip can not occur before the Start Date.

 
 
Additional terms and conditions

Traveler reimbursement is based on the location of the work activities and not the accommodations, unless lodging is not available at the work activity, then the agency may authorize the rate where lodging is obtained.

Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely surrounded by, the corporate limits of the key city, including independent entities located within those boundaries."

Per diem localities with county definitions shall include"all locations within, or entirely surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties, including independent entities located within the boundaries of the key city and the listed counties (unless otherwise listed separately)."

When a military installation or Government - related facility(whether or not specifically named) is located partially within more than one city or county boundary, the applicable per diem rate for the entire installation or facility is the higher of the rates which apply to the cities and / or counties, even though part(s) of such activities may be located outside the defined per diem locality.