In fiscal years 2018 and 2023, Congress approved funding for the construction of a 255,000-gross-square-foot federal courthouse in Fort Lauderdale, Florida, to better meet the space and security needs of the U.S. District Court for the Southern District of Florida. The new courthouse will include twelve courtrooms and seventeen judges’ chambers and will provide workspace for several other federal agencies, including the U.S. Court of Appeals, the U.S. Bankruptcy Court, the U.S. Marshals Service, the U.S. Attorney’s Office and the U.S. Probation Office.
Design began in March 2023 and finished in October 2024. We separated site preparation and installation of a new seawall along the Tarpon River to allow an early start of limited construction work, which began January 2024, with full construction starting September 2024. Additionally, AT&T and the City of Fort Lauderdale moved existing utilities from the site in December 2023.
Project details
Total authorized funding: $245 million for site acquisition, design and construction services
Project delivery method: Design-Build Bridging
Awarded contracts:
Brasfield & Gorrie LLC — Design-Build
APSI Construction Management — CMa
Skidmore, Owings, & Merrill — Bridging A/E)
Unique site considerations:
Mangroves along the Tarpon River will be preserved
Seawall construction carefully designed around existing vegetation
As of April 1, 2026, construction is approximately 80% complete. As well:
Pavilion steel erection is finished, including column concrete pour backs, with all trades working toward the end date.
Gypsum installation and finish paint are nearing completion on Level 3, and the gypsum crew is now focused on Level 1 to allow subcontractors to move offices into the building, facilitating the removal of Conex and GC office trailers.
Multiple crews continue framing (nearing completion on Level 10), shaft liners (nearing completion), and finishing on various levels.
Courtroom installations (millwork, access flooring, painting, carpet, and electrical) are complete on Levels 5 and 6, with Level 7 in process. Millwork for Level 9 has been received, and Grand Jury room millwork is installed, enabling overhead work like acoustical ceiling installation. Other millwork, including break rooms, continues.
Masonry is complete except for minor finishes.
Electrical work is ongoing, with closets being energized and lighting completed in courtrooms.
Permanent lighting installation and energizing are starting on Level 2 and moving up.
HVAC installation continues; chillers and cooling towers are started and programmed, and conditioned air is being supplied to three floors. Duct work is nearing completion on Level 8 and for DOAS units.
Both penthouses are framed and closed, improving watertightness (finalized after buck hoist removal).
Elevator machinery has arrived and is set, with TK now on site.
Approximately 225 tradesmen are on the job, accounting for about 9,000 man-hours per week. Metal decking is installed on the roof, with roofing scheduled for next month. Internal Pavilion components, such as HVAC hangers and overhead drain lines, are being roughed in. Pre-cast panel installation is complete.
PER DIEM LOOK-UP
1
Choose a location
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Get my location
OR
OR
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Traveler reimbursement is based on the location of the work activities and not the accommodations,
unless lodging is not available at the work activity, then the agency may authorize the rate where
lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely
surrounded by, the corporate limits of the key city, including independent entities located within
those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely
surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties,
including independent entities located within the boundaries of the key city and the listed counties
(unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is
located partially within more than one city or county boundary, the applicable per diem rate for the
entire installation or facility is the higher of the rates which apply to the cities and / or counties,
even though part(s) of such activities may be located outside the defined per diem locality.