Built in 1967, the BOTA LPOE is located on the international border separating El Paso, TX, and Ciudad Juarez, Chihuahua, MX. This land port connects with the Mexican land port of “Cordova” in Juarez, Chihuahua, MX, and is one of four crossings in El Paso. The port processes toll-free inbound and outbound commercial, non-commercial, and pedestrian traffic. As a result, the volume of traffic is heavy with many travelers and commercial vehicles choosing to enter and exit through this facility in lieu of paying a toll.
Much of the port facility has reached the end of its life cycle as most of the buildings and infrastructure are operating at or beyond capacity no longer meeting the U.S. Customs and Border Protection current design standards. Being the only toll-free port of entry in El Paso, an increase in truck and vehicular traffic over the last few years has created significant congestion making it difficult to support this increased volume of traffic.
The BOTA LPOE sits on approximately 28 acres of fully developed property surrounded on three sides by an extensive highway system.

Address: 3600 E Paisano Dr, El Paso, TX 79905
Year constructed: 1967
Port size: 28 Acres
Budget:
Total: $474,000,000–$579,300,000
Primary tenants:
U.S. Customs and Border Protection
USDA Animal and Plant Health Inspection Service
FDA
Department of Transportation
U.S. Fish and Wildlife Service
The BOTA LPOE modernization project is advancing and adhering to revised guidelines that align with executive orders and updated policy.
The contract solicitation for the project’s design and construction is anticipated in fall 2025. The Sources Sought Notice was posted on May 8, 2025.
GSA remains committed to providing updates as they become available.
On May 2, 2025, GSA released the Record of Decision (ROD) to accompany the final Environmental Impact Statement (EIS). The ROD officially selected the project’s preferred alternative and provided the rationale behind the choice. This completed the project’s National Environmental Policy Act review that began in 2023.
The ROD, final EIS and associated documents are available for viewing.
| Planning | Design | Construction |
|---|---|---|
Enhanced feasibility study Environmental and site needs | Contract award | Start Substantial completion |
Find out more by visiting the design and construction contract page.
No current work is being done to the actual site at this time. The project will help improve traffic flow and border security while decreasing wait times for travelers.
GSA received $3.4 billion to invest in our nation’s infrastructure and competitiveness. The law provides funding for LPOE modernization projects that will create new good-paying jobs, bolster safety and security, and make our economy more resilient to supply chain challenges.
Visit the Texas LPOE page for an overview of IIJA projects there, as well as priorities, benefits and further information.
GSA will fully modernize the port with a new administration building, new pedestrian processing lanes, new primary building, and new passenger vehicle lanes. The project will help improve traffic flow and border security while decreasing wait times for travelers.
Jorge Pineda
682-269-9322
jorge.pineda@gsa.gov and/or press@gsa.gov
Error, The Per Diem API is not responding. Please try again later.
No results could be found for the location you've entered.
Rates for Alaska, Hawaii, and U.S. territories and possessions are set by the Department of Defense.
Rates for foreign countries are set by the Department of State.
Rates are available between 10/1/2023 and 09/30/2026.
The End Date of your trip can not occur before the Start Date.
Traveler reimbursement is based on the location of the work activities and not the accommodations, unless lodging is not available at the work activity, then the agency may authorize the rate where lodging is obtained.
Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely surrounded by, the corporate limits of the key city, including independent entities located within those boundaries."
Per diem localities with county definitions shall include"all locations within, or entirely surrounded by, the corporate limits of the key city as well as the boundaries of the listed counties, including independent entities located within the boundaries of the key city and the listed counties (unless otherwise listed separately)."
When a military installation or Government - related facility(whether or not specifically named) is located partially within more than one city or county boundary, the applicable per diem rate for the entire installation or facility is the higher of the rates which apply to the cities and / or counties, even though part(s) of such activities may be located outside the defined per diem locality.